Journey type
Metro connection
Journey summary
Line-by-line directions for this trip
Time
123 min
Fare
₹64.0
Approx. distance
65.5 km
Stations on route
37
Route plan
Start on Red Line towards Rithala from Shaheed Nagar. Change 1 time before reaching Kirti Nagar (Green Line Branch).
Towards Rithala
Shaheed Nagar to Inderlok
Change to Green Line at Inderlok
Towards Kirti Nagar (Green Line Branch)
Inderlok to Kirti Nagar (Green Line Branch)
Route at a glance
This summary is calculated for Shaheed Nagar to Kirti Nagar (Green Line Branch)from the ordered station and line graph used by the planner.
Journey type
Metro connection
Lines used
Red Line → Green Line
Network changes
1 interchange
Interchange sequence: Inderlok.
Line and station naming reference: Delhi Metro Rail Corporation operational network map
Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.
Start journey on Red Line towards Rithala
Change to Green Line
Destination
Destination station
Parking
Not confirmed in our data
ATM
Not confirmed in our data
Toilet
Not confirmed in our data
Lift
Recorded as available
Escalator
Recorded as available
Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.
This calculated journey covers approximately 65.5 km and 36 stops. The planner estimates 123 minutes of travel and a standard estimated fare of ₹64. It uses 2 line sections with 1 interchange.
These stations are listed in travel order using the same network data as the route calculation.
Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.
Standard estimated fare
₹64.0
Estimated smart card fare
₹57.6
Estimated fare where eligible
₹51.2
The metro route from Shaheed Nagar to Kirti Nagar (Green Line Branch) has 37 stations, 65.5 km approximate distance and 1 interchange. Follow the station-by-station timeline for the complete route.
The estimated standard fare for this route is ₹64.0. With a smart card or NCMC, the estimate is ₹57.6. The eligible off-peak/MJQRT estimate is ₹51.2. Operator eligibility rules and the final amount shown before payment take priority.
The estimated travel time is 123 minutes, including interchange time where applicable.
Board the Red Line from Shaheed Nagar towards Rithala.
You need to change metro at Inderlok on this route.
There are 37 stations on the route from Shaheed Nagar to Kirti Nagar (Green Line Branch), including the starting and destination stations. This means there are 36 metro stops between the two stations.
This route uses Red Line, Green Line. Follow the route timeline to see where each line starts and where to change trains.
Stations on this route are Shaheed Nagar, Dilshad Garden, Jhilmil, Mansarovar Park, Shahdara, Welcome, Seelampur, Shastri Park, Kashmere Gate, Tis Hazari, Pul Bangash, Pratap Nagar, Shastri Nagar, Inderlok, Ashok Park Main, Punjabi Bagh, Punjabi Bagh West, Shivaji Park, Madipur, Paschim Vihar East, Paschim Vihar West, Peeragarhi, Udyog Nagar, Maharaja Surajmal Stadium, Nangloi, Nangloi Railway Station, Rajdhani Park, Mundka, Mundka Industrial Area (MIA), Ghevra, Tikri Kalan, Tikri Border, Pandit Shree Ram Sharma, Bahadurgarh City, Brigadier Hoshiyar Singh, Satguru Ram Singh Marg, Kirti Nagar (Green Line Branch).