Journey type
Metro connection
Journey summary
Line-by-line directions for this trip
Time
14 min
Fare
₹32.0
Approx. distance
8.2 km
Stations on route
8
Route plan
Start on Red Line towards Rithala from Shaheed Sthal (New Bus Adda). Stay on the same metro line until Shaheed Nagar.
Towards Rithala
Shaheed Sthal (New Bus Adda) to Shaheed Nagar
Route at a glance
This summary is calculated for Shaheed Sthal (New Bus Adda) to Shaheed Nagarfrom the ordered station and line graph used by the planner.
Journey type
Metro connection
Lines used
Red Line
Network changes
Direct journey
Line and station naming reference: Delhi Metro Rail Corporation operational network map
Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.
Start journey on Red Line towards Rithala
Destination
Destination station
Parking
Recorded as available
ATM
Recorded as available
Toilet
Recorded as available
Lift
Recorded as available
Escalator
Recorded as available
DMRC published reference; verify current gate and lift status on arrival.
Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.
This calculated journey covers approximately 8.2 km and 7 stops. The planner estimates 14 minutes of travel and a standard estimated fare of ₹32. It uses 1 line section without a line change.
These stations are listed in travel order using the same network data as the route calculation.
Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.
Standard estimated fare
₹32.0
Estimated smart card fare
₹28.8
Estimated fare where eligible
₹25.6
The metro route from Shaheed Sthal (New Bus Adda) to Shaheed Nagar has 8 stations, 8.2 km approximate distance and 0 interchanges. Follow the station-by-station timeline for the complete route.
The estimated standard fare for this route is ₹32.0. With a smart card or NCMC, the estimate is ₹28.8. The eligible off-peak/MJQRT estimate is ₹25.6. Operator eligibility rules and the final amount shown before payment take priority.
The estimated travel time is 14 minutes, including interchange time where applicable.
Board the Red Line from Shaheed Sthal (New Bus Adda) towards Rithala.
No interchange is required on this route. You can stay on the same metro line until Shaheed Nagar.
There are 8 stations on the route from Shaheed Sthal (New Bus Adda) to Shaheed Nagar, including the starting and destination stations. This means there are 7 metro stops between the two stations.
This route uses Red Line. Follow the route timeline to see where each line starts and where to change trains.
Stations on this route are Shaheed Sthal (New Bus Adda), Hindon River, Arthala, Mohan Nagar, Shyam Park, Major Mohit Sharma Rajendra Nagar, Raj Bagh, Shaheed Nagar.