Journey summary

Vinobapuri to Shaheed Sthal (New Bus Adda)

Line-by-line directions for this trip

Time

77 min

Fare

₹54.0

Approx. distance

31.6 km

Stations on route

27

Route plan

Start on Pink Line towards Majlis Park from Vinobapuri. Change 3 times before reaching Shaheed Sthal (New Bus Adda).

Pink LineBoard for 1 station

Towards Majlis Park

Vinobapuri to Lajpat Nagar

Change to Violet Line at Lajpat Nagar

Violet LineContinue for 4 stations

Towards Kashmere Gate

Lajpat Nagar to Central Secretariat

Change to Yellow Line at Central Secretariat

Yellow LineContinue for 6 stations

Towards Samaypur Badli

Central Secretariat to Kashmere Gate

Change to Red Line at Kashmere Gate

Red LineContinue for 15 stations

Towards Shaheed Sthal (New Bus Adda)

Kashmere Gate to Shaheed Sthal (New Bus Adda)

Route at a glance

Calculated network summary

This summary is calculated for Vinobapuri to Shaheed Sthal (New Bus Adda)from the ordered station and line graph used by the planner.

Journey type

Metro connection

Lines used

Pink Line → Violet Line → Yellow Line → Red Line

Network changes

3 interchanges

Interchange sequence: Lajpat Nagar → Central Secretariat → Kashmere Gate.

Practical planning note: Use the calculated line direction and interchange sequence below, and allow additional time for platform walking at major hubs.

Line and station naming reference: Delhi Metro Rail Corporation operational network map

Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.

Route Timeline

Pink LineBoard for 1 stationTowards Majlis Park
Vinobapuri

Start journey on Pink Line towards Majlis Park

Lajpat Nagar

Change to Violet Line

Violet LineContinue for 4 stationsTowards Kashmere Gate
Yellow LineContinue for 6 stationsTowards Samaypur Badli

Destination station

Shaheed Sthal (New Bus Adda)

Red Line
View station details

Parking

Recorded as available

ATM

Recorded as available

Toilet

Recorded as available

Lift

Recorded as available

Escalator

Recorded as available

Accessibility information

  • Gate No.1: On GT Road towards Ghaziabad
  • Gate No.2: On GT Road towards Delhi

DMRC published reference; verify current gate and lift status on arrival.

Facilities reported along this route

Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.

Journey overview

This calculated journey covers approximately 31.6 km and 26 stops. The planner estimates 77 minutes of travel and a standard estimated fare of 54. It uses 4 line sections with 3 interchanges.

Interchange guidance

  • Change lines inside Lajpat Nagar. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Central Secretariat. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Kashmere Gate. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
Fare and journey time are planning estimates. Platform numbers, live disruptions and gate availability can change, so confirm the line name and terminal direction on station displays before boarding.

Fare Options

Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.

Standard fare (QR ticket)

Standard estimated fare

Base

54.0

Smart card / NCMC fare

Estimated smart card fare

48.6

Discounted fare (off-peak / MJQRT)

Estimated fare where eligible

20% off

43.2

Frequently Asked Questions

What is the metro route from Vinobapuri to Shaheed Sthal (New Bus Adda)?

The metro route from Vinobapuri to Shaheed Sthal (New Bus Adda) has 27 stations, 31.6 km approximate distance and 3 interchanges. Follow the station-by-station timeline for the complete route.

How much is the fare from Vinobapuri to Shaheed Sthal (New Bus Adda)?

The estimated standard fare for this route is ₹54.0. With a smart card or NCMC, the estimate is ₹48.6. The eligible off-peak/MJQRT estimate is ₹43.2. Operator eligibility rules and the final amount shown before payment take priority.

How long does it take from Vinobapuri to Shaheed Sthal (New Bus Adda)?

The estimated travel time is 77 minutes, including interchange time where applicable.

Which metro line should I board from Vinobapuri?

Board the Pink Line from Vinobapuri towards Majlis Park.

Where do I change metro between Vinobapuri and Shaheed Sthal (New Bus Adda)?

You need to change metro at Lajpat Nagar, Central Secretariat, Kashmere Gate on this route.

How many stations are there from Vinobapuri to Shaheed Sthal (New Bus Adda)?

There are 27 stations on the route from Vinobapuri to Shaheed Sthal (New Bus Adda), including the starting and destination stations. This means there are 26 metro stops between the two stations.

Which metro lines are used from Vinobapuri to Shaheed Sthal (New Bus Adda)?

This route uses Pink Line, Violet Line, Yellow Line, Red Line. Follow the route timeline to see where each line starts and where to change trains.

What are the stations between Vinobapuri and Shaheed Sthal (New Bus Adda)?

Stations on this route are Vinobapuri, Lajpat Nagar, Jangpura, Jawaharlal Nehru Stadium, Khan Market, Central Secretariat, Patel Chowk, Rajiv Chowk, New Delhi, Chawri Bazar, Chandni Chowk, Kashmere Gate, Shastri Park, Seelampur, Welcome, Shahdara, Mansarovar Park, Jhilmil, Dilshad Garden, Shaheed Nagar, Raj Bagh, Major Mohit Sharma Rajendra Nagar, Shyam Park, Mohan Nagar, Arthala, Hindon River, Shaheed Sthal (New Bus Adda).