Journey summary

Tagore Garden to Phase 3

Line-by-line directions for this trip

Time

164 min

Fare

₹64.0

Approx. distance

81.3 km

Stations on route

31

Route plan

Start on Blue Line (Main) towards Dwarka Sector 21 from Tagore Garden. Change 3 times before reaching Phase 3.

Blue Line (Main)Board for 5 stations

Towards Dwarka Sector 21

Tagore Garden to Janakpuri West

Change to Magenta Line at Janakpuri West

Magenta LineContinue for 11 stations

Towards Botanical Garden

Janakpuri West to Hauz Khas

Change to Yellow Line at Hauz Khas

Yellow LineContinue for 9 stations

Towards Millennium City Centre Gurugram

Hauz Khas to Sikanderpur

Change to Rapid Metro Gurugram at Sikanderpur

Rapid Metro GurugramContinue for 5 stations

Towards Phase 3

Sikanderpur to Phase 3

Route at a glance

Calculated network summary

This summary is calculated for Tagore Garden to Phase 3from the ordered station and line graph used by the planner.

Journey type

Metro connection

Lines used

Blue Line (Main) → Magenta Line → Yellow Line → Rapid Metro Gurugram

Network changes

3 interchanges

Interchange sequence: Janakpuri West → Hauz Khas → Sikanderpur.

Practical planning note: Use the calculated line direction and interchange sequence below, and allow additional time for platform walking at major hubs.

Line and station naming reference: Delhi Metro Rail Corporation operational network map

Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.

Route Timeline

Blue Line (Main)Board for 5 stationsTowards Dwarka Sector 21
Tagore Garden

Start journey on Blue Line (Main) towards Dwarka Sector 21

Janakpuri West

Change to Magenta Line

Yellow LineContinue for 9 stationsTowards Millennium City Centre Gurugram
Rapid Metro GurugramContinue for 5 stationsTowards Phase 3

Destination station

Phase 3

Rapid Metro Gurugram
View station details

Parking

Not confirmed in our data

ATM

Not confirmed in our data

Toilet

Recorded as available

Lift

Recorded as available

Escalator

Recorded as available

Facilities reported along this route

Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.

Journey overview

This calculated journey covers approximately 81.3 km and 30 stops. The planner estimates 164 minutes of travel and a standard estimated fare of 64. It uses 4 line sections with 3 interchanges.

Interchange guidance

  • Change lines inside Janakpuri West. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Hauz Khas. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Sikanderpur. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
Fare and journey time are planning estimates. Platform numbers, live disruptions and gate availability can change, so confirm the line name and terminal direction on station displays before boarding.

Fare Options

Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.

Standard fare (QR ticket)

Standard estimated fare

Base

64.0

Smart card / NCMC fare

Estimated smart card fare

57.6

Discounted fare (off-peak / MJQRT)

Estimated fare where eligible

20% off

51.2

Frequently Asked Questions

What is the metro route from Tagore Garden to Phase 3?

The metro route from Tagore Garden to Phase 3 has 31 stations, 81.3 km approximate distance and 3 interchanges. Follow the station-by-station timeline for the complete route.

How much is the fare from Tagore Garden to Phase 3?

The estimated standard fare for this route is ₹64.0. With a smart card or NCMC, the estimate is ₹57.6. The eligible off-peak/MJQRT estimate is ₹51.2. Operator eligibility rules and the final amount shown before payment take priority.

How long does it take from Tagore Garden to Phase 3?

The estimated travel time is 164 minutes, including interchange time where applicable.

Which metro line should I board from Tagore Garden?

Board the Blue Line (Main) from Tagore Garden towards Dwarka Sector 21.

Where do I change metro between Tagore Garden and Phase 3?

You need to change metro at Janakpuri West, Hauz Khas, Sikanderpur on this route.

How many stations are there from Tagore Garden to Phase 3?

There are 31 stations on the route from Tagore Garden to Phase 3, including the starting and destination stations. This means there are 30 metro stops between the two stations.

Which metro lines are used from Tagore Garden to Phase 3?

This route uses Blue Line (Main), Magenta Line, Yellow Line, Rapid Metro Gurugram. Follow the route timeline to see where each line starts and where to change trains.

What are the stations between Tagore Garden and Phase 3?

Stations on this route are Tagore Garden, Subhash Nagar, Tilak Nagar, Yamuna Bank, Janakpuri East, Janakpuri West, Dabri Mor - Janakpuri South, Dashrath Puri, Palam, Sadar Bazar Cantonment, Terminal 1-IGI Airport, Shankar Vihar, Vasant Vihar, Kishan Garh, Munirka, IIT, Hauz Khas, Malviya Nagar, Saket, Qutab Minar, Chhatarpur, Sultanpur, Ghitorni, Arjan Garh, Guru Dronacharya, Sikanderpur, Phase 2, Belvedere Towers, Cyber City, Moulsari Avenue, Phase 3.