Journey summary

Shastri Park to Phase 3

Line-by-line directions for this trip

Time

75 min

Fare

₹64.0

Approx. distance

34.8 km

Stations on route

29

Route plan

Start on Red Line towards Rithala from Shastri Park. Change 2 times before reaching Phase 3.

Red LineBoard for 1 station

Towards Rithala

Shastri Park to Kashmere Gate

Change to Yellow Line at Kashmere Gate

Yellow LineContinue for 22 stations

Towards Millennium City Centre Gurugram

Kashmere Gate to Sikanderpur

Change to Rapid Metro Gurugram at Sikanderpur

Rapid Metro GurugramContinue for 5 stations

Towards Phase 3

Sikanderpur to Phase 3

Route at a glance

Calculated network summary

This summary is calculated for Shastri Park to Phase 3from the ordered station and line graph used by the planner.

Journey type

Metro connection

Lines used

Red Line → Yellow Line → Rapid Metro Gurugram

Network changes

2 interchanges

Interchange sequence: Kashmere Gate → Sikanderpur.

Practical planning note: Use the calculated line direction and interchange sequence below, and allow additional time for platform walking at major hubs.

Line and station naming reference: Delhi Metro Rail Corporation operational network map

Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.

Route Timeline

Red LineBoard for 1 stationTowards Rithala
Shastri Park

Start journey on Red Line towards Rithala

Kashmere Gate

Change to Yellow Line

Rapid Metro GurugramContinue for 5 stationsTowards Phase 3

Destination station

Phase 3

Rapid Metro Gurugram
View station details

Parking

Not confirmed in our data

ATM

Not confirmed in our data

Toilet

Recorded as available

Lift

Recorded as available

Escalator

Recorded as available

Facilities reported along this route

Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.

Journey overview

This calculated journey covers approximately 34.8 km and 28 stops. The planner estimates 75 minutes of travel and a standard estimated fare of 64. It uses 3 line sections with 2 interchanges.

Interchange guidance

  • Change lines inside Kashmere Gate. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Sikanderpur. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
Fare and journey time are planning estimates. Platform numbers, live disruptions and gate availability can change, so confirm the line name and terminal direction on station displays before boarding.

Fare Options

Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.

Standard fare (QR ticket)

Standard estimated fare

Base

64.0

Smart card / NCMC fare

Estimated smart card fare

57.6

Discounted fare (off-peak / MJQRT)

Estimated fare where eligible

20% off

51.2

Frequently Asked Questions

What is the metro route from Shastri Park to Phase 3?

The metro route from Shastri Park to Phase 3 has 29 stations, 34.8 km approximate distance and 2 interchanges. Follow the station-by-station timeline for the complete route.

How much is the fare from Shastri Park to Phase 3?

The estimated standard fare for this route is ₹64.0. With a smart card or NCMC, the estimate is ₹57.6. The eligible off-peak/MJQRT estimate is ₹51.2. Operator eligibility rules and the final amount shown before payment take priority.

How long does it take from Shastri Park to Phase 3?

The estimated travel time is 75 minutes, including interchange time where applicable.

Which metro line should I board from Shastri Park?

Board the Red Line from Shastri Park towards Rithala.

Where do I change metro between Shastri Park and Phase 3?

You need to change metro at Kashmere Gate, Sikanderpur on this route.

How many stations are there from Shastri Park to Phase 3?

There are 29 stations on the route from Shastri Park to Phase 3, including the starting and destination stations. This means there are 28 metro stops between the two stations.

Which metro lines are used from Shastri Park to Phase 3?

This route uses Red Line, Yellow Line, Rapid Metro Gurugram. Follow the route timeline to see where each line starts and where to change trains.

What are the stations between Shastri Park and Phase 3?

Stations on this route are Shastri Park, Kashmere Gate, Chandni Chowk, Chawri Bazar, New Delhi, Rajiv Chowk, Patel Chowk, Central Secretariat, Udyog Bhawan, Lok Kalyan Marg, Jor Bagh, Dilli Haat INA, AIIMS, Green Park, Hauz Khas, Malviya Nagar, Saket, Qutab Minar, Chhatarpur, Sultanpur, Ghitorni, Arjan Garh, Guru Dronacharya, Sikanderpur, Phase 2, Belvedere Towers, Cyber City, Moulsari Avenue, Phase 3.