Journey summary

Sector 55-56 to Phase 1

Line-by-line directions for this trip

Time

8 min

Fare

₹21.0

Approx. distance

4.5 km

Stations on route

5

Route plan

Start on Rapid Metro Gurugram towards Phase 3 from Sector 55-56. Stay on the same metro line until Phase 1.

Rapid Metro GurugramBoard for 4 stations

Towards Phase 3

Sector 55-56 to Phase 1

Route at a glance

Calculated network summary

This summary is calculated for Sector 55-56 to Phase 1from the ordered station and line graph used by the planner.

Journey type

Metro connection

Lines used

Rapid Metro Gurugram

Network changes

Direct journey

Practical planning note: Use the calculated line direction and interchange sequence below, and allow additional time for platform walking at major hubs.

Line and station naming reference: Delhi Metro Rail Corporation operational network map

Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.

Route Timeline

Rapid Metro GurugramBoard for 4 stationsTowards Phase 3
Sector 55-56

Start journey on Rapid Metro Gurugram towards Phase 3

Phase 1

Destination

Destination station

Phase 1

Rapid Metro Gurugram
View station details

Parking

Not confirmed in our data

ATM

Not confirmed in our data

Toilet

Recorded as available

Lift

Recorded as available

Escalator

Recorded as available

Facilities reported along this route

Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.

Parking

0 stations

This facility is not confirmed at a station on this route.

ATM

0 stations

This facility is not confirmed at a station on this route.

Journey overview

This calculated journey covers approximately 4.5 km and 4 stops. The planner estimates 8 minutes of travel and a standard estimated fare of 21. It uses 1 line section without a line change.

Stations on this route

These stations are listed in travel order using the same network data as the route calculation.

  1. Sector 55-56
  2. Sector 54 Chowk
  3. Sector 53-54
  4. Sector 42-43
  5. Phase 1
Fare and journey time are planning estimates. Platform numbers, live disruptions and gate availability can change, so confirm the line name and terminal direction on station displays before boarding.

Fare Options

Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.

Standard fare (QR ticket)

Standard estimated fare

Base

21.0

Smart card / NCMC fare

Estimated smart card fare

18.9

Discounted fare (off-peak / MJQRT)

Estimated fare where eligible

20% off

16.8

Frequently Asked Questions

What is the metro route from Sector 55-56 to Phase 1?

The metro route from Sector 55-56 to Phase 1 has 5 stations, 4.5 km approximate distance and 0 interchanges. Follow the station-by-station timeline for the complete route.

How much is the fare from Sector 55-56 to Phase 1?

The estimated standard fare for this route is ₹21.0. With a smart card or NCMC, the estimate is ₹18.9. The eligible off-peak/MJQRT estimate is ₹16.8. Operator eligibility rules and the final amount shown before payment take priority.

How long does it take from Sector 55-56 to Phase 1?

The estimated travel time is 8 minutes, including interchange time where applicable.

Which metro line should I board from Sector 55-56?

Board the Rapid Metro Gurugram from Sector 55-56 towards Phase 3.

Where do I change metro between Sector 55-56 and Phase 1?

No interchange is required on this route. You can stay on the same metro line until Phase 1.

How many stations are there from Sector 55-56 to Phase 1?

There are 5 stations on the route from Sector 55-56 to Phase 1, including the starting and destination stations. This means there are 4 metro stops between the two stations.

Which metro lines are used from Sector 55-56 to Phase 1?

This route uses Rapid Metro Gurugram. Follow the route timeline to see where each line starts and where to change trains.

What are the stations between Sector 55-56 and Phase 1?

Stations on this route are Sector 55-56, Sector 54 Chowk, Sector 53-54, Sector 42-43, Phase 1.