Journey type
Metro connection
Journey summary
Line-by-line directions for this trip
Time
78 min
Fare
₹64.0
Approx. distance
36.3 km
Stations on route
28
Route plan
Start on Rapid Metro Gurugram towards Phase 3 from Sector 42-43. Change 2 times before reaching Kirti Nagar.
Towards Phase 3
Sector 42-43 to Sikanderpur
Change to Yellow Line at Sikanderpur
Towards Samaypur Badli
Sikanderpur to Rajiv Chowk
Change to Blue Line (Main) at Rajiv Chowk
Towards Dwarka Sector 21
Rajiv Chowk to Kirti Nagar
Route at a glance
This summary is calculated for Sector 42-43 to Kirti Nagarfrom the ordered station and line graph used by the planner.
Journey type
Metro connection
Lines used
Rapid Metro Gurugram → Yellow Line → Blue Line (Main)
Network changes
2 interchanges
Interchange sequence: Sikanderpur → Rajiv Chowk.
Line and station naming reference: Delhi Metro Rail Corporation operational network map
Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.
Start journey on Rapid Metro Gurugram towards Phase 3
Change to Yellow Line
Destination station
Parking
Recorded as available
ATM
Recorded as available
Toilet
Recorded as available
Lift
Recorded as available
Escalator
Recorded as available
DMRC published reference; verify current gate and lift status on arrival.
Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.
This calculated journey covers approximately 36.3 km and 27 stops. The planner estimates 78 minutes of travel and a standard estimated fare of ₹64. It uses 3 line sections with 2 interchanges.
These stations are listed in travel order using the same network data as the route calculation.
Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.
Standard estimated fare
₹64.0
Estimated smart card fare
₹57.6
Estimated fare where eligible
₹51.2
The metro route from Sector 42-43 to Kirti Nagar has 28 stations, 36.3 km approximate distance and 2 interchanges. Follow the station-by-station timeline for the complete route.
The estimated standard fare for this route is ₹64.0. With a smart card or NCMC, the estimate is ₹57.6. The eligible off-peak/MJQRT estimate is ₹51.2. Operator eligibility rules and the final amount shown before payment take priority.
The estimated travel time is 78 minutes, including interchange time where applicable.
Board the Rapid Metro Gurugram from Sector 42-43 towards Phase 3.
You need to change metro at Sikanderpur, Rajiv Chowk on this route.
There are 28 stations on the route from Sector 42-43 to Kirti Nagar, including the starting and destination stations. This means there are 27 metro stops between the two stations.
This route uses Rapid Metro Gurugram, Yellow Line, Blue Line (Main). Follow the route timeline to see where each line starts and where to change trains.
Stations on this route are Sector 42-43, Phase 1, Sikanderpur, Guru Dronacharya, Arjan Garh, Ghitorni, Sultanpur, Chhatarpur, Qutab Minar, Saket, Malviya Nagar, Hauz Khas, Green Park, AIIMS, Dilli Haat INA, Jor Bagh, Lok Kalyan Marg, Udyog Bhawan, Central Secretariat, Patel Chowk, Rajiv Chowk, Ramakrishna Ashram Marg, Jhandewalan, Karol Bagh, Rajendra Place, Patel Nagar, Shadipur, Kirti Nagar.