Journey summary

Phase 3 to Sector 42-43

Line-by-line directions for this trip

Time

12 min

Fare

₹32.0

Approx. distance

6.1 km

Stations on route

8

Route plan

Start on Rapid Metro Gurugram towards Sector 55-56 from Phase 3. Stay on the same metro line until Sector 42-43.

Rapid Metro GurugramBoard for 7 stations

Towards Sector 55-56

Phase 3 to Sector 42-43

Route at a glance

Calculated network summary

This summary is calculated for Phase 3 to Sector 42-43from the ordered station and line graph used by the planner.

Journey type

Metro connection

Lines used

Rapid Metro Gurugram

Network changes

Direct journey

Practical planning note: Use the calculated line direction and interchange sequence below, and allow additional time for platform walking at major hubs.

Line and station naming reference: Delhi Metro Rail Corporation operational network map

Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.

Route Timeline

Rapid Metro GurugramBoard for 7 stationsTowards Sector 55-56
Phase 3

Start journey on Rapid Metro Gurugram towards Sector 55-56

Sector 42-43

Destination

Destination station

Sector 42-43

Rapid Metro Gurugram
View station details

Parking

Not confirmed in our data

ATM

Not confirmed in our data

Toilet

Recorded as available

Lift

Recorded as available

Escalator

Recorded as available

Facilities reported along this route

Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.

Journey overview

This calculated journey covers approximately 6.1 km and 7 stops. The planner estimates 12 minutes of travel and a standard estimated fare of 32. It uses 1 line section without a line change.

Stations on this route

These stations are listed in travel order using the same network data as the route calculation.

  1. Phase 3
  2. Moulsari Avenue
  3. Cyber City
  4. Belvedere Towers
  5. Phase 2
  6. Sikanderpur
  7. Phase 1
  8. Sector 42-43
Fare and journey time are planning estimates. Platform numbers, live disruptions and gate availability can change, so confirm the line name and terminal direction on station displays before boarding.

Fare Options

Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.

Standard fare (QR ticket)

Standard estimated fare

Base

32.0

Smart card / NCMC fare

Estimated smart card fare

28.8

Discounted fare (off-peak / MJQRT)

Estimated fare where eligible

20% off

25.6

Frequently Asked Questions

What is the metro route from Phase 3 to Sector 42-43?

The metro route from Phase 3 to Sector 42-43 has 8 stations, 6.1 km approximate distance and 0 interchanges. Follow the station-by-station timeline for the complete route.

How much is the fare from Phase 3 to Sector 42-43?

The estimated standard fare for this route is ₹32.0. With a smart card or NCMC, the estimate is ₹28.8. The eligible off-peak/MJQRT estimate is ₹25.6. Operator eligibility rules and the final amount shown before payment take priority.

How long does it take from Phase 3 to Sector 42-43?

The estimated travel time is 12 minutes, including interchange time where applicable.

Which metro line should I board from Phase 3?

Board the Rapid Metro Gurugram from Phase 3 towards Sector 55-56.

Where do I change metro between Phase 3 and Sector 42-43?

No interchange is required on this route. You can stay on the same metro line until Sector 42-43.

How many stations are there from Phase 3 to Sector 42-43?

There are 8 stations on the route from Phase 3 to Sector 42-43, including the starting and destination stations. This means there are 7 metro stops between the two stations.

Which metro lines are used from Phase 3 to Sector 42-43?

This route uses Rapid Metro Gurugram. Follow the route timeline to see where each line starts and where to change trains.

What are the stations between Phase 3 and Sector 42-43?

Stations on this route are Phase 3, Moulsari Avenue, Cyber City, Belvedere Towers, Phase 2, Sikanderpur, Phase 1, Sector 42-43.