Journey summary

Phase 3 to Sector 28 Faridabad

Line-by-line directions for this trip

Time

89 min

Fare

₹64.0

Approx. distance

38.4 km

Stations on route

31

Route plan

Start on Rapid Metro Gurugram towards Sector 55-56 from Phase 3. Change 3 times before reaching Sector 28 Faridabad.

Rapid Metro GurugramBoard for 5 stations

Towards Sector 55-56

Phase 3 to Sikanderpur

Change to Yellow Line at Sikanderpur

Yellow LineContinue for 9 stations

Towards Samaypur Badli

Sikanderpur to Hauz Khas

Change to Magenta Line at Hauz Khas

Magenta LineContinue for 5 stations

Towards Botanical Garden

Hauz Khas to Kalkaji Mandir

Change to Violet Line at Kalkaji Mandir

Violet LineContinue for 11 stations

Towards Raja Nahar Singh (Ballabhgarh)

Kalkaji Mandir to Sector 28 Faridabad

Route at a glance

Calculated network summary

This summary is calculated for Phase 3 to Sector 28 Faridabadfrom the ordered station and line graph used by the planner.

Journey type

Metro connection

Lines used

Rapid Metro Gurugram → Yellow Line → Magenta Line → Violet Line

Network changes

3 interchanges

Interchange sequence: Sikanderpur → Hauz Khas → Kalkaji Mandir.

Practical planning note: Use the calculated line direction and interchange sequence below, and allow additional time for platform walking at major hubs.

Line and station naming reference: Delhi Metro Rail Corporation operational network map

Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.

Route Timeline

Rapid Metro GurugramBoard for 5 stationsTowards Sector 55-56
Phase 3

Start journey on Rapid Metro Gurugram towards Sector 55-56

Sikanderpur

Change to Yellow Line

Yellow LineContinue for 9 stationsTowards Samaypur Badli
Magenta LineContinue for 5 stationsTowards Botanical Garden

Destination station

Sector 28 Faridabad

Violet Line
View station details

Parking

Recorded as available

ATM

Not confirmed in our data

Toilet

Recorded as available

Lift

Recorded as available

Escalator

Recorded as available

Accessibility information

  • Lift No.3: Near Gate No.1&2 of the Station; near Sec-28, Sec-30, SRS Cinema
  • Lift No.4: Near Gate No.3 of Station; near Baby playschool, Escorts Corp. Center

DMRC published reference; verify current gate and lift status on arrival.

Facilities reported along this route

Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.

Journey overview

This calculated journey covers approximately 38.4 km and 30 stops. The planner estimates 89 minutes of travel and a standard estimated fare of 64. It uses 4 line sections with 3 interchanges.

Interchange guidance

  • Change lines inside Sikanderpur. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Hauz Khas. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Kalkaji Mandir. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
Fare and journey time are planning estimates. Platform numbers, live disruptions and gate availability can change, so confirm the line name and terminal direction on station displays before boarding.

Fare Options

Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.

Standard fare (QR ticket)

Standard estimated fare

Base

64.0

Smart card / NCMC fare

Estimated smart card fare

57.6

Discounted fare (off-peak / MJQRT)

Estimated fare where eligible

20% off

51.2

Frequently Asked Questions

What is the metro route from Phase 3 to Sector 28 Faridabad?

The metro route from Phase 3 to Sector 28 Faridabad has 31 stations, 38.4 km approximate distance and 3 interchanges. Follow the station-by-station timeline for the complete route.

How much is the fare from Phase 3 to Sector 28 Faridabad?

The estimated standard fare for this route is ₹64.0. With a smart card or NCMC, the estimate is ₹57.6. The eligible off-peak/MJQRT estimate is ₹51.2. Operator eligibility rules and the final amount shown before payment take priority.

How long does it take from Phase 3 to Sector 28 Faridabad?

The estimated travel time is 89 minutes, including interchange time where applicable.

Which metro line should I board from Phase 3?

Board the Rapid Metro Gurugram from Phase 3 towards Sector 55-56.

Where do I change metro between Phase 3 and Sector 28 Faridabad?

You need to change metro at Sikanderpur, Hauz Khas, Kalkaji Mandir on this route.

How many stations are there from Phase 3 to Sector 28 Faridabad?

There are 31 stations on the route from Phase 3 to Sector 28 Faridabad, including the starting and destination stations. This means there are 30 metro stops between the two stations.

Which metro lines are used from Phase 3 to Sector 28 Faridabad?

This route uses Rapid Metro Gurugram, Yellow Line, Magenta Line, Violet Line. Follow the route timeline to see where each line starts and where to change trains.

What are the stations between Phase 3 and Sector 28 Faridabad?

Stations on this route are Phase 3, Moulsari Avenue, Cyber City, Belvedere Towers, Phase 2, Sikanderpur, Guru Dronacharya, Arjan Garh, Ghitorni, Sultanpur, Chhatarpur, Qutab Minar, Saket, Malviya Nagar, Hauz Khas, Panchsheel Park, Chirag Delhi, Greater Kailash, Nehru Enclave, Kalkaji Mandir, Govind Puri, Harkesh Nagar Okhla, Jasola Apollo, Sarita Vihar, Mohan Estate, Tughlakabad Station, Badarpur Border, Sarai, NHPC Chowk, Mewala Maharajpur, Sector 28 Faridabad.