Journey summary

Phase 3 to Rajiv Chowk

Line-by-line directions for this trip

Time

57 min

Fare

₹54.0

Approx. distance

28.4 km

Stations on route

24

First train

5:51 AM

Last train

11:45 PM

First and last train times use reported Rajiv Chowk timing data. Direction-wise timing can vary by line and destination.

Route plan

Start on Rapid Metro Gurugram towards Sector 55-56 from Phase 3. Change 1 time before reaching Rajiv Chowk.

Rapid Metro GurugramBoard for 5 stations

Towards Sector 55-56

Phase 3 to Sikanderpur

Change to Yellow Line at Sikanderpur

Yellow LineContinue for 18 stations

Towards Samaypur Badli

Sikanderpur to Rajiv Chowk

Route at a glance

Calculated network summary

This summary is calculated for Phase 3 to Rajiv Chowkfrom the ordered station and line graph used by the planner.

Journey type

Metro connection

Lines used

Rapid Metro Gurugram → Yellow Line

Network changes

1 interchange

Interchange sequence: Sikanderpur.

Practical planning note: Use the calculated line direction and interchange sequence below, and allow additional time for platform walking at major hubs.

Line and station naming reference: Delhi Metro Rail Corporation operational network map

Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.

Route Timeline

Rapid Metro GurugramBoard for 5 stationsTowards Sector 55-56
Phase 3

Start journey on Rapid Metro Gurugram towards Sector 55-56

Sikanderpur

Change to Yellow Line

Destination station

Rajiv Chowk

Yellow LineBlue Line (Main)
View station details

Parking

Not confirmed in our data

ATM

Recorded as available

Toilet

Recorded as available

Lift

Recorded as available

Escalator

Recorded as available

Nearby places

Connaught Place, Central Park, Janpath, Palika Bazar, PVR Plaza

Useful exits

  • Gate 1: Radial Road-3, Panchkuian Road, A Block
  • Gate 2: Radial Road-2, Baba Kharak Singh Marg, A Block
  • Gate 3: Radial Road-1, Janpath Road, Palika Bazar

Accessibility information

  • Lift No.5: Near Gate No.1&2 of the Station; near Block B

DMRC published reference; verify current gate and lift status on arrival.

Facilities reported along this route

Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.

Journey overview

This calculated journey covers approximately 28.4 km and 23 stops. The planner estimates 57 minutes of travel and a standard estimated fare of 54. It uses 2 line sections with 1 interchange.

Interchange guidance

  • Change lines inside Sikanderpur. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
Fare and journey time are planning estimates. Platform numbers, live disruptions and gate availability can change, so confirm the line name and terminal direction on station displays before boarding.

Fare Options

Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.

Standard fare (QR ticket)

Standard estimated fare

Base

54.0

Smart card / NCMC fare

Estimated smart card fare

48.6

Discounted fare (off-peak / MJQRT)

Estimated fare where eligible

20% off

43.2

Frequently Asked Questions

What is the metro route from Phase 3 to Rajiv Chowk?

The metro route from Phase 3 to Rajiv Chowk has 24 stations, 28.4 km approximate distance and 1 interchange. Follow the station-by-station timeline for the complete route.

How much is the fare from Phase 3 to Rajiv Chowk?

The estimated standard fare for this route is ₹54.0. With a smart card or NCMC, the estimate is ₹48.6. The eligible off-peak/MJQRT estimate is ₹43.2. Operator eligibility rules and the final amount shown before payment take priority.

How long does it take from Phase 3 to Rajiv Chowk?

The estimated travel time is 57 minutes, including interchange time where applicable.

Which metro line should I board from Phase 3?

Board the Rapid Metro Gurugram from Phase 3 towards Sector 55-56.

Where do I change metro between Phase 3 and Rajiv Chowk?

You need to change metro at Sikanderpur on this route.

How many stations are there from Phase 3 to Rajiv Chowk?

There are 24 stations on the route from Phase 3 to Rajiv Chowk, including the starting and destination stations. This means there are 23 metro stops between the two stations.

Which metro lines are used from Phase 3 to Rajiv Chowk?

This route uses Rapid Metro Gurugram, Yellow Line. Follow the route timeline to see where each line starts and where to change trains.

What are the stations between Phase 3 and Rajiv Chowk?

Stations on this route are Phase 3, Moulsari Avenue, Cyber City, Belvedere Towers, Phase 2, Sikanderpur, Guru Dronacharya, Arjan Garh, Ghitorni, Sultanpur, Chhatarpur, Qutab Minar, Saket, Malviya Nagar, Hauz Khas, Green Park, AIIMS, Dilli Haat INA, Jor Bagh, Lok Kalyan Marg, Udyog Bhawan, Central Secretariat, Patel Chowk, Rajiv Chowk.