Journey summary

Phase 3 to Kirti Nagar (Green Line Branch)

Line-by-line directions for this trip

Time

267 min

Fare

₹64.0

Approx. distance

131.7 km

Stations on route

54

Route plan

Start on Rapid Metro Gurugram towards Sector 55-56 from Phase 3. Change 5 times before reaching Kirti Nagar (Green Line Branch).

Rapid Metro GurugramBoard for 5 stations

Towards Sector 55-56

Phase 3 to Sikanderpur

Change to Yellow Line at Sikanderpur

Yellow LineContinue for 9 stations

Towards Samaypur Badli

Sikanderpur to Hauz Khas

Change to Magenta Line at Hauz Khas

Magenta LineContinue for 11 stations

Towards Janakpuri West

Hauz Khas to Janakpuri West

Change to Blue Line (Main) at Janakpuri West

Blue Line (Main)Continue for 6 stations

Towards Noida Electronic City

Janakpuri West to Rajouri Garden

Change to Pink Line at Rajouri Garden

Pink LineContinue for 2 stations

Towards Majlis Park

Rajouri Garden to Punjabi Bagh West

Change to Green Line at Punjabi Bagh West

Green LineContinue for 20 stations

Towards Kirti Nagar (Green Line Branch)

Punjabi Bagh West to Kirti Nagar (Green Line Branch)

Route at a glance

Calculated network summary

This summary is calculated for Phase 3 to Kirti Nagar (Green Line Branch)from the ordered station and line graph used by the planner.

Journey type

Metro connection

Lines used

Rapid Metro Gurugram → Yellow Line → Magenta Line → Blue Line (Main) → Pink Line → Green Line

Network changes

5 interchanges

Interchange sequence: Sikanderpur → Hauz Khas → Janakpuri West → Rajouri Garden → Punjabi Bagh West.

Practical planning note: Use the calculated line direction and interchange sequence below, and allow additional time for platform walking at major hubs.

Line and station naming reference: Delhi Metro Rail Corporation operational network map

Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.

Route Timeline

Rapid Metro GurugramBoard for 5 stationsTowards Sector 55-56
Phase 3

Start journey on Rapid Metro Gurugram towards Sector 55-56

Sikanderpur

Change to Yellow Line

Yellow LineContinue for 9 stationsTowards Samaypur Badli
Blue Line (Main)Continue for 6 stationsTowards Noida Electronic City
Pink LineContinue for 2 stationsTowards Majlis Park

Destination station

Kirti Nagar (Green Line Branch)

Blue Line (Main)Green Line
View station details

Parking

Not confirmed in our data

ATM

Not confirmed in our data

Toilet

Not confirmed in our data

Lift

Recorded as available

Escalator

Recorded as available

Facilities reported along this route

Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.

Journey overview

This calculated journey covers approximately 131.7 km and 53 stops. The planner estimates 267 minutes of travel and a standard estimated fare of 64. It uses 6 line sections with 5 interchanges.

Interchange guidance

  • Change lines inside Sikanderpur. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Hauz Khas. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Janakpuri West. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Rajouri Garden. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Punjabi Bagh West. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.

Stations on this route

These stations are listed in travel order using the same network data as the route calculation.

  1. Phase 3
  2. Moulsari Avenue
  3. Cyber City
  4. Belvedere Towers
  5. Phase 2
  6. Sikanderpur
  7. Guru Dronacharya
  8. Arjan Garh
  9. Ghitorni
  10. Sultanpur
  11. Chhatarpur
  12. Qutab Minar
  13. Saket
  14. Malviya Nagar
  15. Hauz Khas
  16. IIT
  17. Munirka
  18. Kishan Garh
  19. Vasant Vihar
  20. Shankar Vihar
  21. Terminal 1-IGI Airport
  22. Sadar Bazar Cantonment
  23. Palam
  24. Dashrath Puri
  25. Dabri Mor - Janakpuri South
  26. Janakpuri West
  27. Janakpuri East
  28. Yamuna Bank
  29. Tilak Nagar
  30. Subhash Nagar
  31. Tagore Garden
  32. Rajouri Garden
  33. ESI - Basaidarapur
  34. Punjabi Bagh West
  35. Shivaji Park
  36. Madipur
  37. Paschim Vihar East
  38. Paschim Vihar West
  39. Peeragarhi
  40. Udyog Nagar
  41. Maharaja Surajmal Stadium
  42. Nangloi
  43. Nangloi Railway Station
  44. Rajdhani Park
  45. Mundka
  46. Mundka Industrial Area (MIA)
  47. Ghevra
  48. Tikri Kalan
  49. Tikri Border
  50. Pandit Shree Ram Sharma
  51. Bahadurgarh City
  52. Brigadier Hoshiyar Singh
  53. Satguru Ram Singh Marg
  54. Kirti Nagar (Green Line Branch)
Fare and journey time are planning estimates. Platform numbers, live disruptions and gate availability can change, so confirm the line name and terminal direction on station displays before boarding.

Fare Options

Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.

Standard fare (QR ticket)

Standard estimated fare

Base

64.0

Smart card / NCMC fare

Estimated smart card fare

57.6

Discounted fare (off-peak / MJQRT)

Estimated fare where eligible

20% off

51.2

Frequently Asked Questions

What is the metro route from Phase 3 to Kirti Nagar (Green Line Branch)?

The metro route from Phase 3 to Kirti Nagar (Green Line Branch) has 54 stations, 131.7 km approximate distance and 5 interchanges. Follow the station-by-station timeline for the complete route.

How much is the fare from Phase 3 to Kirti Nagar (Green Line Branch)?

The estimated standard fare for this route is ₹64.0. With a smart card or NCMC, the estimate is ₹57.6. The eligible off-peak/MJQRT estimate is ₹51.2. Operator eligibility rules and the final amount shown before payment take priority.

How long does it take from Phase 3 to Kirti Nagar (Green Line Branch)?

The estimated travel time is 267 minutes, including interchange time where applicable.

Which metro line should I board from Phase 3?

Board the Rapid Metro Gurugram from Phase 3 towards Sector 55-56.

Where do I change metro between Phase 3 and Kirti Nagar (Green Line Branch)?

You need to change metro at Sikanderpur, Hauz Khas, Janakpuri West, Rajouri Garden, Punjabi Bagh West on this route.

How many stations are there from Phase 3 to Kirti Nagar (Green Line Branch)?

There are 54 stations on the route from Phase 3 to Kirti Nagar (Green Line Branch), including the starting and destination stations. This means there are 53 metro stops between the two stations.

Which metro lines are used from Phase 3 to Kirti Nagar (Green Line Branch)?

This route uses Rapid Metro Gurugram, Yellow Line, Magenta Line, Blue Line (Main), Pink Line, Green Line. Follow the route timeline to see where each line starts and where to change trains.

What are the stations between Phase 3 and Kirti Nagar (Green Line Branch)?

Stations on this route are Phase 3, Moulsari Avenue, Cyber City, Belvedere Towers, Phase 2, Sikanderpur, Guru Dronacharya, Arjan Garh, Ghitorni, Sultanpur, Chhatarpur, Qutab Minar, Saket, Malviya Nagar, Hauz Khas, IIT, Munirka, Kishan Garh, Vasant Vihar, Shankar Vihar, Terminal 1-IGI Airport, Sadar Bazar Cantonment, Palam, Dashrath Puri, Dabri Mor - Janakpuri South, Janakpuri West, Janakpuri East, Yamuna Bank, Tilak Nagar, Subhash Nagar, Tagore Garden, Rajouri Garden, ESI - Basaidarapur, Punjabi Bagh West, Shivaji Park, Madipur, Paschim Vihar East, Paschim Vihar West, Peeragarhi, Udyog Nagar, Maharaja Surajmal Stadium, Nangloi, Nangloi Railway Station, Rajdhani Park, Mundka, Mundka Industrial Area (MIA), Ghevra, Tikri Kalan, Tikri Border, Pandit Shree Ram Sharma, Bahadurgarh City, Brigadier Hoshiyar Singh, Satguru Ram Singh Marg, Kirti Nagar (Green Line Branch).