Journey summary

Phase 2 to Central Secretariat

Line-by-line directions for this trip

Time

49 min

Fare

₹54.0

Approx. distance

23.9 km

Stations on route

18

Route plan

Start on Rapid Metro Gurugram towards Sector 55-56 from Phase 2. Change 1 time before reaching Central Secretariat.

Rapid Metro GurugramBoard for 1 station

Towards Sector 55-56

Phase 2 to Sikanderpur

Change to Yellow Line at Sikanderpur

Yellow LineContinue for 16 stations

Towards Samaypur Badli

Sikanderpur to Central Secretariat

Route at a glance

Calculated network summary

This summary is calculated for Phase 2 to Central Secretariatfrom the ordered station and line graph used by the planner.

Journey type

Metro connection

Lines used

Rapid Metro Gurugram → Yellow Line

Network changes

1 interchange

Interchange sequence: Sikanderpur.

Practical planning note: Use the calculated line direction and interchange sequence below, and allow additional time for platform walking at major hubs.

Line and station naming reference: Delhi Metro Rail Corporation operational network map

Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.

Route Timeline

Rapid Metro GurugramBoard for 1 stationTowards Sector 55-56
Phase 2

Start journey on Rapid Metro Gurugram towards Sector 55-56

Sikanderpur

Change to Yellow Line

Destination station

Central Secretariat

Yellow LineViolet Line
View station details

Parking

Not confirmed in our data

ATM

Recorded as available

Toilet

Recorded as available

Lift

Recorded as available

Escalator

Recorded as available

Accessibility information

  • Lift No.3: Near Gate No.5 of the Station; towards Rail Bhawan
  • Lift No.3A: Near Gate No.3 of the Station; towards India Gate

DMRC published reference; verify current gate and lift status on arrival.

Facilities reported along this route

Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.

Journey overview

This calculated journey covers approximately 23.9 km and 17 stops. The planner estimates 49 minutes of travel and a standard estimated fare of 54. It uses 2 line sections with 1 interchange.

Interchange guidance

  • Change lines inside Sikanderpur. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
Fare and journey time are planning estimates. Platform numbers, live disruptions and gate availability can change, so confirm the line name and terminal direction on station displays before boarding.

Fare Options

Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.

Standard fare (QR ticket)

Standard estimated fare

Base

54.0

Smart card / NCMC fare

Estimated smart card fare

48.6

Discounted fare (off-peak / MJQRT)

Estimated fare where eligible

20% off

43.2

Frequently Asked Questions

What is the metro route from Phase 2 to Central Secretariat?

The metro route from Phase 2 to Central Secretariat has 18 stations, 23.9 km approximate distance and 1 interchange. Follow the station-by-station timeline for the complete route.

How much is the fare from Phase 2 to Central Secretariat?

The estimated standard fare for this route is ₹54.0. With a smart card or NCMC, the estimate is ₹48.6. The eligible off-peak/MJQRT estimate is ₹43.2. Operator eligibility rules and the final amount shown before payment take priority.

How long does it take from Phase 2 to Central Secretariat?

The estimated travel time is 49 minutes, including interchange time where applicable.

Which metro line should I board from Phase 2?

Board the Rapid Metro Gurugram from Phase 2 towards Sector 55-56.

Where do I change metro between Phase 2 and Central Secretariat?

You need to change metro at Sikanderpur on this route.

How many stations are there from Phase 2 to Central Secretariat?

There are 18 stations on the route from Phase 2 to Central Secretariat, including the starting and destination stations. This means there are 17 metro stops between the two stations.

Which metro lines are used from Phase 2 to Central Secretariat?

This route uses Rapid Metro Gurugram, Yellow Line. Follow the route timeline to see where each line starts and where to change trains.

What are the stations between Phase 2 and Central Secretariat?

Stations on this route are Phase 2, Sikanderpur, Guru Dronacharya, Arjan Garh, Ghitorni, Sultanpur, Chhatarpur, Qutab Minar, Saket, Malviya Nagar, Hauz Khas, Green Park, AIIMS, Dilli Haat INA, Jor Bagh, Lok Kalyan Marg, Udyog Bhawan, Central Secretariat.