Journey summary

Phase 1 to Shiv Vihar

Line-by-line directions for this trip

Time

93 min

Fare

₹64.0

Approx. distance

40.6 km

Stations on route

32

Route plan

Start on Rapid Metro Gurugram towards Phase 3 from Phase 1. Change 3 times before reaching Shiv Vihar.

Rapid Metro GurugramBoard for 1 station

Towards Phase 3

Phase 1 to Sikanderpur

Change to Yellow Line at Sikanderpur

Yellow LineContinue for 22 stations

Towards Samaypur Badli

Sikanderpur to Kashmere Gate

Change to Red Line at Kashmere Gate

Red LineContinue for 3 stations

Towards Shaheed Sthal (New Bus Adda)

Kashmere Gate to Welcome

Change to Pink Line at Welcome

Pink LineContinue for 5 stations

Towards Shiv Vihar

Welcome to Shiv Vihar

Route at a glance

Calculated network summary

This summary is calculated for Phase 1 to Shiv Viharfrom the ordered station and line graph used by the planner.

Journey type

Metro connection

Lines used

Rapid Metro Gurugram → Yellow Line → Red Line → Pink Line

Network changes

3 interchanges

Interchange sequence: Sikanderpur → Kashmere Gate → Welcome.

Practical planning note: Use the calculated line direction and interchange sequence below, and allow additional time for platform walking at major hubs.

Line and station naming reference: Delhi Metro Rail Corporation operational network map

Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.

Route Timeline

Rapid Metro GurugramBoard for 1 stationTowards Phase 3
Phase 1

Start journey on Rapid Metro Gurugram towards Phase 3

Sikanderpur

Change to Yellow Line

Red LineContinue for 3 stationsTowards Shaheed Sthal (New Bus Adda)
Welcome

Change to Pink Line

Pink LineContinue for 5 stationsTowards Shiv Vihar

Destination station

Shiv Vihar

Pink Line
View station details

Parking

Not confirmed in our data

ATM

Not confirmed in our data

Toilet

Recorded as available

Lift

Recorded as available

Escalator

Recorded as available

Accessibility information

  • Lift No.3: Near Gate No.1 of the Station; on Loni main road towards Loni
  • Lift No.4: Near Gate No.2 of Station; on Loni Main Road towards Gokulpuri

DMRC published reference; verify current gate and lift status on arrival.

Facilities reported along this route

Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.

Journey overview

This calculated journey covers approximately 40.6 km and 31 stops. The planner estimates 93 minutes of travel and a standard estimated fare of 64. It uses 4 line sections with 3 interchanges.

Interchange guidance

  • Change lines inside Sikanderpur. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Kashmere Gate. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Welcome. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
Fare and journey time are planning estimates. Platform numbers, live disruptions and gate availability can change, so confirm the line name and terminal direction on station displays before boarding.

Fare Options

Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.

Standard fare (QR ticket)

Standard estimated fare

Base

64.0

Smart card / NCMC fare

Estimated smart card fare

57.6

Discounted fare (off-peak / MJQRT)

Estimated fare where eligible

20% off

51.2

Frequently Asked Questions

What is the metro route from Phase 1 to Shiv Vihar?

The metro route from Phase 1 to Shiv Vihar has 32 stations, 40.6 km approximate distance and 3 interchanges. Follow the station-by-station timeline for the complete route.

How much is the fare from Phase 1 to Shiv Vihar?

The estimated standard fare for this route is ₹64.0. With a smart card or NCMC, the estimate is ₹57.6. The eligible off-peak/MJQRT estimate is ₹51.2. Operator eligibility rules and the final amount shown before payment take priority.

How long does it take from Phase 1 to Shiv Vihar?

The estimated travel time is 93 minutes, including interchange time where applicable.

Which metro line should I board from Phase 1?

Board the Rapid Metro Gurugram from Phase 1 towards Phase 3.

Where do I change metro between Phase 1 and Shiv Vihar?

You need to change metro at Sikanderpur, Kashmere Gate, Welcome on this route.

How many stations are there from Phase 1 to Shiv Vihar?

There are 32 stations on the route from Phase 1 to Shiv Vihar, including the starting and destination stations. This means there are 31 metro stops between the two stations.

Which metro lines are used from Phase 1 to Shiv Vihar?

This route uses Rapid Metro Gurugram, Yellow Line, Red Line, Pink Line. Follow the route timeline to see where each line starts and where to change trains.

What are the stations between Phase 1 and Shiv Vihar?

Stations on this route are Phase 1, Sikanderpur, Guru Dronacharya, Arjan Garh, Ghitorni, Sultanpur, Chhatarpur, Qutab Minar, Saket, Malviya Nagar, Hauz Khas, Green Park, AIIMS, Dilli Haat INA, Jor Bagh, Lok Kalyan Marg, Udyog Bhawan, Central Secretariat, Patel Chowk, Rajiv Chowk, New Delhi, Chawri Bazar, Chandni Chowk, Kashmere Gate, Shastri Park, Seelampur, Welcome, Jaffrabad, Maujpur - Babarpur, Gokulpuri, Johri Enclave, Shiv Vihar.