Journey summary

Phase 1 to Netaji Subhash Place

Line-by-line directions for this trip

Time

84 min

Fare

₹64.0

Approx. distance

39.8 km

Stations on route

32

Route plan

Start on Rapid Metro Gurugram towards Phase 3 from Phase 1. Change 2 times before reaching Netaji Subhash Place.

Rapid Metro GurugramBoard for 1 station

Towards Phase 3

Phase 1 to Sikanderpur

Change to Yellow Line at Sikanderpur

Yellow LineContinue for 22 stations

Towards Samaypur Badli

Sikanderpur to Kashmere Gate

Change to Red Line at Kashmere Gate

Red LineContinue for 8 stations

Towards Rithala

Kashmere Gate to Netaji Subhash Place

Route at a glance

Calculated network summary

This summary is calculated for Phase 1 to Netaji Subhash Placefrom the ordered station and line graph used by the planner.

Journey type

Metro connection

Lines used

Rapid Metro Gurugram → Yellow Line → Red Line

Network changes

2 interchanges

Interchange sequence: Sikanderpur → Kashmere Gate.

Practical planning note: Use the calculated line direction and interchange sequence below, and allow additional time for platform walking at major hubs.

Line and station naming reference: Delhi Metro Rail Corporation operational network map

Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.

Route Timeline

Rapid Metro GurugramBoard for 1 stationTowards Phase 3
Phase 1

Start journey on Rapid Metro Gurugram towards Phase 3

Sikanderpur

Change to Yellow Line

Destination station

Netaji Subhash Place

Red LinePink Line
View station details

Parking

Recorded as available

ATM

Recorded as available

Toilet

Recorded as available

Lift

Recorded as available

Escalator

Recorded as available

Accessibility information

  • Gate No.3: Via Gate No.3 of the Station
  • Gate No.1: In front of Punjab Kesari Building

DMRC published reference; verify current gate and lift status on arrival.

Facilities reported along this route

Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.

Journey overview

This calculated journey covers approximately 39.8 km and 31 stops. The planner estimates 84 minutes of travel and a standard estimated fare of 64. It uses 3 line sections with 2 interchanges.

Interchange guidance

  • Change lines inside Sikanderpur. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Kashmere Gate. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
Fare and journey time are planning estimates. Platform numbers, live disruptions and gate availability can change, so confirm the line name and terminal direction on station displays before boarding.

Fare Options

Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.

Standard fare (QR ticket)

Standard estimated fare

Base

64.0

Smart card / NCMC fare

Estimated smart card fare

57.6

Discounted fare (off-peak / MJQRT)

Estimated fare where eligible

20% off

51.2

Frequently Asked Questions

What is the metro route from Phase 1 to Netaji Subhash Place?

The metro route from Phase 1 to Netaji Subhash Place has 32 stations, 39.8 km approximate distance and 2 interchanges. Follow the station-by-station timeline for the complete route.

How much is the fare from Phase 1 to Netaji Subhash Place?

The estimated standard fare for this route is ₹64.0. With a smart card or NCMC, the estimate is ₹57.6. The eligible off-peak/MJQRT estimate is ₹51.2. Operator eligibility rules and the final amount shown before payment take priority.

How long does it take from Phase 1 to Netaji Subhash Place?

The estimated travel time is 84 minutes, including interchange time where applicable.

Which metro line should I board from Phase 1?

Board the Rapid Metro Gurugram from Phase 1 towards Phase 3.

Where do I change metro between Phase 1 and Netaji Subhash Place?

You need to change metro at Sikanderpur, Kashmere Gate on this route.

How many stations are there from Phase 1 to Netaji Subhash Place?

There are 32 stations on the route from Phase 1 to Netaji Subhash Place, including the starting and destination stations. This means there are 31 metro stops between the two stations.

Which metro lines are used from Phase 1 to Netaji Subhash Place?

This route uses Rapid Metro Gurugram, Yellow Line, Red Line. Follow the route timeline to see where each line starts and where to change trains.

What are the stations between Phase 1 and Netaji Subhash Place?

Stations on this route are Phase 1, Sikanderpur, Guru Dronacharya, Arjan Garh, Ghitorni, Sultanpur, Chhatarpur, Qutab Minar, Saket, Malviya Nagar, Hauz Khas, Green Park, AIIMS, Dilli Haat INA, Jor Bagh, Lok Kalyan Marg, Udyog Bhawan, Central Secretariat, Patel Chowk, Rajiv Chowk, New Delhi, Chawri Bazar, Chandni Chowk, Kashmere Gate, Tis Hazari, Pul Bangash, Pratap Nagar, Shastri Nagar, Inderlok, Kanhaiya Nagar, Keshav Puram, Netaji Subhash Place.