Journey summary

Phase 1 to Kirti Nagar

Line-by-line directions for this trip

Time

76 min

Fare

₹64.0

Approx. distance

35.1 km

Stations on route

27

Route plan

Start on Rapid Metro Gurugram towards Phase 3 from Phase 1. Change 2 times before reaching Kirti Nagar.

Rapid Metro GurugramBoard for 1 station

Towards Phase 3

Phase 1 to Sikanderpur

Change to Yellow Line at Sikanderpur

Yellow LineContinue for 18 stations

Towards Samaypur Badli

Sikanderpur to Rajiv Chowk

Change to Blue Line (Main) at Rajiv Chowk

Blue Line (Main)Continue for 7 stations

Towards Dwarka Sector 21

Rajiv Chowk to Kirti Nagar

Route at a glance

Calculated network summary

This summary is calculated for Phase 1 to Kirti Nagarfrom the ordered station and line graph used by the planner.

Journey type

Metro connection

Lines used

Rapid Metro Gurugram → Yellow Line → Blue Line (Main)

Network changes

2 interchanges

Interchange sequence: Sikanderpur → Rajiv Chowk.

Practical planning note: Use the calculated line direction and interchange sequence below, and allow additional time for platform walking at major hubs.

Line and station naming reference: Delhi Metro Rail Corporation operational network map

Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.

Route Timeline

Rapid Metro GurugramBoard for 1 stationTowards Phase 3
Phase 1

Start journey on Rapid Metro Gurugram towards Phase 3

Sikanderpur

Change to Yellow Line

Blue Line (Main)Continue for 7 stationsTowards Dwarka Sector 21

Destination station

Kirti Nagar

Blue Line (Main)Green Line
View station details

Parking

Recorded as available

ATM

Recorded as available

Toilet

Recorded as available

Lift

Recorded as available

Escalator

Recorded as available

Accessibility information

  • Gate No.1: Adjacent to Shadipur Flyover going towards Moti Nagar

DMRC published reference; verify current gate and lift status on arrival.

Facilities reported along this route

Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.

Journey overview

This calculated journey covers approximately 35.1 km and 26 stops. The planner estimates 76 minutes of travel and a standard estimated fare of 64. It uses 3 line sections with 2 interchanges.

Interchange guidance

  • Change lines inside Sikanderpur. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Rajiv Chowk. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
Fare and journey time are planning estimates. Platform numbers, live disruptions and gate availability can change, so confirm the line name and terminal direction on station displays before boarding.

Fare Options

Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.

Standard fare (QR ticket)

Standard estimated fare

Base

64.0

Smart card / NCMC fare

Estimated smart card fare

57.6

Discounted fare (off-peak / MJQRT)

Estimated fare where eligible

20% off

51.2

Frequently Asked Questions

What is the metro route from Phase 1 to Kirti Nagar?

The metro route from Phase 1 to Kirti Nagar has 27 stations, 35.1 km approximate distance and 2 interchanges. Follow the station-by-station timeline for the complete route.

How much is the fare from Phase 1 to Kirti Nagar?

The estimated standard fare for this route is ₹64.0. With a smart card or NCMC, the estimate is ₹57.6. The eligible off-peak/MJQRT estimate is ₹51.2. Operator eligibility rules and the final amount shown before payment take priority.

How long does it take from Phase 1 to Kirti Nagar?

The estimated travel time is 76 minutes, including interchange time where applicable.

Which metro line should I board from Phase 1?

Board the Rapid Metro Gurugram from Phase 1 towards Phase 3.

Where do I change metro between Phase 1 and Kirti Nagar?

You need to change metro at Sikanderpur, Rajiv Chowk on this route.

How many stations are there from Phase 1 to Kirti Nagar?

There are 27 stations on the route from Phase 1 to Kirti Nagar, including the starting and destination stations. This means there are 26 metro stops between the two stations.

Which metro lines are used from Phase 1 to Kirti Nagar?

This route uses Rapid Metro Gurugram, Yellow Line, Blue Line (Main). Follow the route timeline to see where each line starts and where to change trains.

What are the stations between Phase 1 and Kirti Nagar?

Stations on this route are Phase 1, Sikanderpur, Guru Dronacharya, Arjan Garh, Ghitorni, Sultanpur, Chhatarpur, Qutab Minar, Saket, Malviya Nagar, Hauz Khas, Green Park, AIIMS, Dilli Haat INA, Jor Bagh, Lok Kalyan Marg, Udyog Bhawan, Central Secretariat, Patel Chowk, Rajiv Chowk, Ramakrishna Ashram Marg, Jhandewalan, Karol Bagh, Rajendra Place, Patel Nagar, Shadipur, Kirti Nagar.