Journey summary

New Ashok Nagar to Phase 3

Line-by-line directions for this trip

Time

87 min

Fare

₹64.0

Approx. distance

37.5 km

Stations on route

30

Route plan

Start on Blue Line (Main) towards Dwarka Sector 21 from New Ashok Nagar. Change 3 times before reaching Phase 3.

Blue Line (Main)Board for 6 stations

Towards Dwarka Sector 21

New Ashok Nagar to Mandi House

Change to Violet Line at Mandi House

Violet LineContinue for 2 stations

Towards Raja Nahar Singh (Ballabhgarh)

Mandi House to Central Secretariat

Change to Yellow Line at Central Secretariat

Yellow LineContinue for 16 stations

Towards Millennium City Centre Gurugram

Central Secretariat to Sikanderpur

Change to Rapid Metro Gurugram at Sikanderpur

Rapid Metro GurugramContinue for 5 stations

Towards Phase 3

Sikanderpur to Phase 3

Route at a glance

Calculated network summary

This summary is calculated for New Ashok Nagar to Phase 3from the ordered station and line graph used by the planner.

Journey type

Metro connection

Lines used

Blue Line (Main) → Violet Line → Yellow Line → Rapid Metro Gurugram

Network changes

3 interchanges

Interchange sequence: Mandi House → Central Secretariat → Sikanderpur.

Practical planning note: Use the calculated line direction and interchange sequence below, and allow additional time for platform walking at major hubs.

Line and station naming reference: Delhi Metro Rail Corporation operational network map

Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.

Route Timeline

Blue Line (Main)Board for 6 stationsTowards Dwarka Sector 21
New Ashok Nagar

Start journey on Blue Line (Main) towards Dwarka Sector 21

Mandi House

Change to Violet Line

Violet LineContinue for 2 stationsTowards Raja Nahar Singh (Ballabhgarh)
Central Secretariat

Change to Yellow Line

Rapid Metro GurugramContinue for 5 stationsTowards Phase 3

Destination station

Phase 3

Rapid Metro Gurugram
View station details

Parking

Not confirmed in our data

ATM

Not confirmed in our data

Toilet

Recorded as available

Lift

Recorded as available

Escalator

Recorded as available

Facilities reported along this route

Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.

Journey overview

This calculated journey covers approximately 37.5 km and 29 stops. The planner estimates 87 minutes of travel and a standard estimated fare of 64. It uses 4 line sections with 3 interchanges.

Interchange guidance

  • Change lines inside Mandi House. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Central Secretariat. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Sikanderpur. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
Fare and journey time are planning estimates. Platform numbers, live disruptions and gate availability can change, so confirm the line name and terminal direction on station displays before boarding.

Fare Options

Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.

Standard fare (QR ticket)

Standard estimated fare

Base

64.0

Smart card / NCMC fare

Estimated smart card fare

57.6

Discounted fare (off-peak / MJQRT)

Estimated fare where eligible

20% off

51.2

Frequently Asked Questions

What is the metro route from New Ashok Nagar to Phase 3?

The metro route from New Ashok Nagar to Phase 3 has 30 stations, 37.5 km approximate distance and 3 interchanges. Follow the station-by-station timeline for the complete route.

How much is the fare from New Ashok Nagar to Phase 3?

The estimated standard fare for this route is ₹64.0. With a smart card or NCMC, the estimate is ₹57.6. The eligible off-peak/MJQRT estimate is ₹51.2. Operator eligibility rules and the final amount shown before payment take priority.

How long does it take from New Ashok Nagar to Phase 3?

The estimated travel time is 87 minutes, including interchange time where applicable.

Which metro line should I board from New Ashok Nagar?

Board the Blue Line (Main) from New Ashok Nagar towards Dwarka Sector 21.

Where do I change metro between New Ashok Nagar and Phase 3?

You need to change metro at Mandi House, Central Secretariat, Sikanderpur on this route.

How many stations are there from New Ashok Nagar to Phase 3?

There are 30 stations on the route from New Ashok Nagar to Phase 3, including the starting and destination stations. This means there are 29 metro stops between the two stations.

Which metro lines are used from New Ashok Nagar to Phase 3?

This route uses Blue Line (Main), Violet Line, Yellow Line, Rapid Metro Gurugram. Follow the route timeline to see where each line starts and where to change trains.

What are the stations between New Ashok Nagar and Phase 3?

Stations on this route are New Ashok Nagar, Mayur Vihar Extension, Mayur Vihar Phase-1, Akshardham, Indraprastha, Supreme Court, Mandi House, Janpath, Central Secretariat, Udyog Bhawan, Lok Kalyan Marg, Jor Bagh, Dilli Haat INA, AIIMS, Green Park, Hauz Khas, Malviya Nagar, Saket, Qutab Minar, Chhatarpur, Sultanpur, Ghitorni, Arjan Garh, Guru Dronacharya, Sikanderpur, Phase 2, Belvedere Towers, Cyber City, Moulsari Avenue, Phase 3.