Journey summary

Mayur Vihar Phase-1 to Rithala

Line-by-line directions for this trip

Time

103 min

Fare

₹64.0

Approx. distance

42.6 km

Stations on route

21

Route plan

Start on Pink Line towards Shiv Vihar from Mayur Vihar Phase-1. Change 4 times before reaching Rithala.

Pink LineBoard for 6 stations

Towards Shiv Vihar

Mayur Vihar Phase-1 to Anand Vihar ISBT

Change to Blue Line (Branch) at Anand Vihar ISBT

Blue Line (Branch)Continue for 1 station

Towards Vaishali

Anand Vihar ISBT to Yamuna Bank

Change to Blue Line (Main) at Yamuna Bank

Blue Line (Main)Continue for 4 stations

Towards Noida Electronic City

Yamuna Bank to Rajouri Garden

Change to Pink Line at Rajouri Garden

Pink LineContinue for 4 stations

Towards Majlis Park

Rajouri Garden to Netaji Subhash Place

Change to Red Line at Netaji Subhash Place

Red LineContinue for 5 stations

Towards Rithala

Netaji Subhash Place to Rithala

Route at a glance

Calculated network summary

This summary is calculated for Mayur Vihar Phase-1 to Rithalafrom the ordered station and line graph used by the planner.

Journey type

Metro connection

Lines used

Pink Line → Blue Line (Branch) → Blue Line (Main) → Red Line

Network changes

4 interchanges

Interchange sequence: Anand Vihar ISBT → Yamuna Bank → Rajouri Garden → Netaji Subhash Place.

Practical planning note: Use the calculated line direction and interchange sequence below, and allow additional time for platform walking at major hubs.

Line and station naming reference: Delhi Metro Rail Corporation operational network map

Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.

Route Timeline

Pink LineBoard for 6 stationsTowards Shiv Vihar
Blue Line (Branch)Continue for 1 stationTowards Vaishali
Yamuna Bank

Change to Blue Line (Main)

Blue Line (Main)Continue for 4 stationsTowards Noida Electronic City
Pink LineContinue for 4 stationsTowards Majlis Park
Red LineContinue for 5 stationsTowards Rithala

Destination station

Rithala

Red Line
View station details

Parking

Recorded as available

ATM

Recorded as available

Toilet

Recorded as available

Lift

Recorded as available

Escalator

Recorded as available

Accessibility information

  • Lift No.3: Near Gate No.3 of the Station; near Delhi Jal Board Office

DMRC published reference; verify current gate and lift status on arrival.

Facilities reported along this route

Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.

Journey overview

This calculated journey covers approximately 42.6 km and 20 stops. The planner estimates 103 minutes of travel and a standard estimated fare of 64. It uses 5 line sections with 4 interchanges.

Interchange guidance

  • Change lines inside Anand Vihar ISBT. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Yamuna Bank. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Rajouri Garden. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Netaji Subhash Place. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
Fare and journey time are planning estimates. Platform numbers, live disruptions and gate availability can change, so confirm the line name and terminal direction on station displays before boarding.

Fare Options

Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.

Standard fare (QR ticket)

Standard estimated fare

Base

64.0

Smart card / NCMC fare

Estimated smart card fare

57.6

Discounted fare (off-peak / MJQRT)

Estimated fare where eligible

20% off

51.2

Frequently Asked Questions

What is the metro route from Mayur Vihar Phase-1 to Rithala?

The metro route from Mayur Vihar Phase-1 to Rithala has 21 stations, 42.6 km approximate distance and 4 interchanges. Follow the station-by-station timeline for the complete route.

How much is the fare from Mayur Vihar Phase-1 to Rithala?

The estimated standard fare for this route is ₹64.0. With a smart card or NCMC, the estimate is ₹57.6. The eligible off-peak/MJQRT estimate is ₹51.2. Operator eligibility rules and the final amount shown before payment take priority.

How long does it take from Mayur Vihar Phase-1 to Rithala?

The estimated travel time is 103 minutes, including interchange time where applicable.

Which metro line should I board from Mayur Vihar Phase-1?

Board the Pink Line from Mayur Vihar Phase-1 towards Shiv Vihar.

Where do I change metro between Mayur Vihar Phase-1 and Rithala?

You need to change metro at Anand Vihar ISBT, Yamuna Bank, Rajouri Garden, Netaji Subhash Place on this route.

How many stations are there from Mayur Vihar Phase-1 to Rithala?

There are 21 stations on the route from Mayur Vihar Phase-1 to Rithala, including the starting and destination stations. This means there are 20 metro stops between the two stations.

Which metro lines are used from Mayur Vihar Phase-1 to Rithala?

This route uses Pink Line, Blue Line (Branch), Blue Line (Main), Red Line. Follow the route timeline to see where each line starts and where to change trains.

What are the stations between Mayur Vihar Phase-1 and Rithala?

Stations on this route are Mayur Vihar Phase-1, Mayur Vihar Pocket 1, Trilokpuri Sanjay Lake, East Vinod Nagar - Mayur Vihar-II, Mandawali - West Vinod Nagar, IP Extension, Anand Vihar ISBT, Yamuna Bank, Tilak Nagar, Subhash Nagar, Tagore Garden, Rajouri Garden, ESI - Basaidarapur, Punjabi Bagh West, Shakurpur, Netaji Subhash Place, Kohat Enclave, Pitampura, Rohini East, Rohini West, Rithala.