Journey summary

Mayur Vihar Phase-1 to Jama Masjid

Line-by-line directions for this trip

Time

24 min

Fare

₹32.0

Approx. distance

9.6 km

Stations on route

8

Route plan

Start on Blue Line (Main) towards Dwarka Sector 21 from Mayur Vihar Phase-1. Change 1 time before reaching Jama Masjid.

Blue Line (Main)Board for 4 stations

Towards Dwarka Sector 21

Mayur Vihar Phase-1 to Mandi House

Change to Violet Line at Mandi House

Violet LineContinue for 3 stations

Towards Kashmere Gate

Mandi House to Jama Masjid

Route at a glance

Calculated network summary

This summary is calculated for Mayur Vihar Phase-1 to Jama Masjidfrom the ordered station and line graph used by the planner.

Journey type

Metro connection

Lines used

Blue Line (Main) → Violet Line

Network changes

1 interchange

Interchange sequence: Mandi House.

Practical planning note: Use the calculated line direction and interchange sequence below, and allow additional time for platform walking at major hubs.

Line and station naming reference: Delhi Metro Rail Corporation operational network map

Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.

Route Timeline

Blue Line (Main)Board for 4 stationsTowards Dwarka Sector 21
Mayur Vihar Phase-1

Start journey on Blue Line (Main) towards Dwarka Sector 21

Mandi House

Change to Violet Line

Violet LineContinue for 3 stationsTowards Kashmere Gate

Destination station

Jama Masjid

Violet Line
View station details

Parking

Not confirmed in our data

ATM

Not confirmed in our data

Toilet

Recorded as available

Lift

Recorded as available

Escalator

Recorded as available

Accessibility information

  • Lift No.2: Near Gate No.1 of the Station; near Kasturba Hospital
  • Lift No.3: Near Gate No.3 of the Station; near Lal Quila

DMRC published reference; verify current gate and lift status on arrival.

Facilities reported along this route

Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.

Journey overview

This calculated journey covers approximately 9.6 km and 7 stops. The planner estimates 24 minutes of travel and a standard estimated fare of 32. It uses 2 line sections with 1 interchange.

Interchange guidance

  • Change lines inside Mandi House. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.

Stations on this route

These stations are listed in travel order using the same network data as the route calculation.

  1. Mayur Vihar Phase-1
  2. Akshardham
  3. Indraprastha
  4. Supreme Court
  5. Mandi House
  6. ITO
  7. Delhi Gate
  8. Jama Masjid
Fare and journey time are planning estimates. Platform numbers, live disruptions and gate availability can change, so confirm the line name and terminal direction on station displays before boarding.

Fare Options

Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.

Standard fare (QR ticket)

Standard estimated fare

Base

32.0

Smart card / NCMC fare

Estimated smart card fare

28.8

Discounted fare (off-peak / MJQRT)

Estimated fare where eligible

20% off

25.6

Frequently Asked Questions

What is the metro route from Mayur Vihar Phase-1 to Jama Masjid?

The metro route from Mayur Vihar Phase-1 to Jama Masjid has 8 stations, 9.6 km approximate distance and 1 interchange. Follow the station-by-station timeline for the complete route.

How much is the fare from Mayur Vihar Phase-1 to Jama Masjid?

The estimated standard fare for this route is ₹32.0. With a smart card or NCMC, the estimate is ₹28.8. The eligible off-peak/MJQRT estimate is ₹25.6. Operator eligibility rules and the final amount shown before payment take priority.

How long does it take from Mayur Vihar Phase-1 to Jama Masjid?

The estimated travel time is 24 minutes, including interchange time where applicable.

Which metro line should I board from Mayur Vihar Phase-1?

Board the Blue Line (Main) from Mayur Vihar Phase-1 towards Dwarka Sector 21.

Where do I change metro between Mayur Vihar Phase-1 and Jama Masjid?

You need to change metro at Mandi House on this route.

How many stations are there from Mayur Vihar Phase-1 to Jama Masjid?

There are 8 stations on the route from Mayur Vihar Phase-1 to Jama Masjid, including the starting and destination stations. This means there are 7 metro stops between the two stations.

Which metro lines are used from Mayur Vihar Phase-1 to Jama Masjid?

This route uses Blue Line (Main), Violet Line. Follow the route timeline to see where each line starts and where to change trains.

What are the stations between Mayur Vihar Phase-1 and Jama Masjid?

Stations on this route are Mayur Vihar Phase-1, Akshardham, Indraprastha, Supreme Court, Mandi House, ITO, Delhi Gate, Jama Masjid.