Journey summary

Mayur Vihar Extension to Welcome

Line-by-line directions for this trip

Time

42 min

Fare

₹43.0

Approx. distance

12.1 km

Stations on route

13

Route plan

Start on Blue Line (Main) towards Dwarka Sector 21 from Mayur Vihar Extension. Change 3 times before reaching Welcome.

Blue Line (Main)Board for 1 station

Towards Dwarka Sector 21

Mayur Vihar Extension to Mayur Vihar Phase-1

Change to Pink Line at Mayur Vihar Phase-1

Pink LineContinue for 6 stations

Towards Shiv Vihar

Mayur Vihar Phase-1 to Anand Vihar ISBT

Change to Blue Line (Branch) at Anand Vihar ISBT

Blue Line (Branch)Continue for 1 station

Towards Laxmi Nagar

Anand Vihar ISBT to Karkarduma

Change to Pink Line at Karkarduma

Pink LineContinue for 4 stations

Towards Shiv Vihar

Karkarduma to Welcome

Route at a glance

Calculated network summary

This summary is calculated for Mayur Vihar Extension to Welcomefrom the ordered station and line graph used by the planner.

Journey type

Metro connection

Lines used

Blue Line (Main) → Pink Line → Blue Line (Branch)

Network changes

3 interchanges

Interchange sequence: Mayur Vihar Phase-1 → Anand Vihar ISBT → Karkarduma.

Practical planning note: Use the calculated line direction and interchange sequence below, and allow additional time for platform walking at major hubs.

Line and station naming reference: Delhi Metro Rail Corporation operational network map

Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.

Route Timeline

Blue Line (Main)Board for 1 stationTowards Dwarka Sector 21
Mayur Vihar Extension

Start journey on Blue Line (Main) towards Dwarka Sector 21

Mayur Vihar Phase-1

Change to Pink Line

Blue Line (Branch)Continue for 1 stationTowards Laxmi Nagar
Karkarduma

Change to Pink Line

Pink LineContinue for 4 stationsTowards Shiv Vihar

Destination station

Welcome

Red LinePink Line
View station details

Parking

Recorded as available

ATM

Recorded as available

Toilet

Recorded as available

Lift

Recorded as available

Escalator

Recorded as available

Accessibility information

  • Gate No.1: From GT Road side towards Delhi
  • Lift No.4A: From GT Road side towards Delhi

DMRC published reference; verify current gate and lift status on arrival.

Facilities reported along this route

Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.

Journey overview

This calculated journey covers approximately 12.1 km and 12 stops. The planner estimates 42 minutes of travel and a standard estimated fare of 43. It uses 4 line sections with 3 interchanges.

Interchange guidance

  • Change lines inside Mayur Vihar Phase-1. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Anand Vihar ISBT. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Karkarduma. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
Fare and journey time are planning estimates. Platform numbers, live disruptions and gate availability can change, so confirm the line name and terminal direction on station displays before boarding.

Fare Options

Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.

Standard fare (QR ticket)

Standard estimated fare

Base

43.0

Smart card / NCMC fare

Estimated smart card fare

38.7

Discounted fare (off-peak / MJQRT)

Estimated fare where eligible

20% off

34.4

Frequently Asked Questions

What is the metro route from Mayur Vihar Extension to Welcome?

The metro route from Mayur Vihar Extension to Welcome has 13 stations, 12.1 km approximate distance and 3 interchanges. Follow the station-by-station timeline for the complete route.

How much is the fare from Mayur Vihar Extension to Welcome?

The estimated standard fare for this route is ₹43.0. With a smart card or NCMC, the estimate is ₹38.7. The eligible off-peak/MJQRT estimate is ₹34.4. Operator eligibility rules and the final amount shown before payment take priority.

How long does it take from Mayur Vihar Extension to Welcome?

The estimated travel time is 42 minutes, including interchange time where applicable.

Which metro line should I board from Mayur Vihar Extension?

Board the Blue Line (Main) from Mayur Vihar Extension towards Dwarka Sector 21.

Where do I change metro between Mayur Vihar Extension and Welcome?

You need to change metro at Mayur Vihar Phase-1, Anand Vihar ISBT, Karkarduma on this route.

How many stations are there from Mayur Vihar Extension to Welcome?

There are 13 stations on the route from Mayur Vihar Extension to Welcome, including the starting and destination stations. This means there are 12 metro stops between the two stations.

Which metro lines are used from Mayur Vihar Extension to Welcome?

This route uses Blue Line (Main), Pink Line, Blue Line (Branch). Follow the route timeline to see where each line starts and where to change trains.

What are the stations between Mayur Vihar Extension and Welcome?

Stations on this route are Mayur Vihar Extension, Mayur Vihar Phase-1, Mayur Vihar Pocket 1, Trilokpuri Sanjay Lake, East Vinod Nagar - Mayur Vihar-II, Mandawali - West Vinod Nagar, IP Extension, Anand Vihar ISBT, Karkarduma, Karkarduma Court, Krishna Nagar, East Azad Nagar, Welcome.