Journey summary

Kishan Garh to Mayur Vihar Phase-1

Line-by-line directions for this trip

Time

64 min

Fare

₹54.0

Approx. distance

24.4 km

Stations on route

17

Route plan

Start on Magenta Line towards Botanical Garden from Kishan Garh. Change 3 times before reaching Mayur Vihar Phase-1.

Magenta LineBoard for 3 stations

Towards Botanical Garden

Kishan Garh to Hauz Khas

Change to Yellow Line at Hauz Khas

Yellow LineContinue for 7 stations

Towards Samaypur Badli

Hauz Khas to Central Secretariat

Change to Violet Line at Central Secretariat

Violet LineContinue for 2 stations

Towards Kashmere Gate

Central Secretariat to Mandi House

Change to Blue Line (Main) at Mandi House

Blue Line (Main)Continue for 4 stations

Towards Noida Electronic City

Mandi House to Mayur Vihar Phase-1

Route at a glance

Calculated network summary

This summary is calculated for Kishan Garh to Mayur Vihar Phase-1from the ordered station and line graph used by the planner.

Journey type

Metro connection

Lines used

Magenta Line → Yellow Line → Violet Line → Blue Line (Main)

Network changes

3 interchanges

Interchange sequence: Hauz Khas → Central Secretariat → Mandi House.

Practical planning note: Use the calculated line direction and interchange sequence below, and allow additional time for platform walking at major hubs.

Line and station naming reference: Delhi Metro Rail Corporation operational network map

Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.

Route Timeline

Magenta LineBoard for 3 stationsTowards Botanical Garden
Kishan Garh

Start journey on Magenta Line towards Botanical Garden

Hauz Khas

Change to Yellow Line

Yellow LineContinue for 7 stationsTowards Samaypur Badli
Violet LineContinue for 2 stationsTowards Kashmere Gate
Mandi House

Change to Blue Line (Main)

Blue Line (Main)Continue for 4 stationsTowards Noida Electronic City

Destination station

Mayur Vihar Phase-1

Blue Line (Main)Pink Line
View station details

Parking

Recorded as available

ATM

Recorded as available

Toilet

Recorded as available

Lift

Recorded as available

Escalator

Recorded as available

Accessibility information

  • Lift No.2: Near Gate No.2 of the Station; towards Mayur Vihar Extn.
  • Lift No.4A: Near Gate No.4 of the Station; towards Rishabh Public School

DMRC published reference; verify current gate and lift status on arrival.

Facilities reported along this route

Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.

Journey overview

This calculated journey covers approximately 24.4 km and 16 stops. The planner estimates 64 minutes of travel and a standard estimated fare of 54. It uses 4 line sections with 3 interchanges.

Interchange guidance

  • Change lines inside Hauz Khas. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Central Secretariat. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Mandi House. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
Fare and journey time are planning estimates. Platform numbers, live disruptions and gate availability can change, so confirm the line name and terminal direction on station displays before boarding.

Fare Options

Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.

Standard fare (QR ticket)

Standard estimated fare

Base

54.0

Smart card / NCMC fare

Estimated smart card fare

48.6

Discounted fare (off-peak / MJQRT)

Estimated fare where eligible

20% off

43.2

Frequently Asked Questions

What is the metro route from Kishan Garh to Mayur Vihar Phase-1?

The metro route from Kishan Garh to Mayur Vihar Phase-1 has 17 stations, 24.4 km approximate distance and 3 interchanges. Follow the station-by-station timeline for the complete route.

How much is the fare from Kishan Garh to Mayur Vihar Phase-1?

The estimated standard fare for this route is ₹54.0. With a smart card or NCMC, the estimate is ₹48.6. The eligible off-peak/MJQRT estimate is ₹43.2. Operator eligibility rules and the final amount shown before payment take priority.

How long does it take from Kishan Garh to Mayur Vihar Phase-1?

The estimated travel time is 64 minutes, including interchange time where applicable.

Which metro line should I board from Kishan Garh?

Board the Magenta Line from Kishan Garh towards Botanical Garden.

Where do I change metro between Kishan Garh and Mayur Vihar Phase-1?

You need to change metro at Hauz Khas, Central Secretariat, Mandi House on this route.

How many stations are there from Kishan Garh to Mayur Vihar Phase-1?

There are 17 stations on the route from Kishan Garh to Mayur Vihar Phase-1, including the starting and destination stations. This means there are 16 metro stops between the two stations.

Which metro lines are used from Kishan Garh to Mayur Vihar Phase-1?

This route uses Magenta Line, Yellow Line, Violet Line, Blue Line (Main). Follow the route timeline to see where each line starts and where to change trains.

What are the stations between Kishan Garh and Mayur Vihar Phase-1?

Stations on this route are Kishan Garh, Munirka, IIT, Hauz Khas, Green Park, AIIMS, Dilli Haat INA, Jor Bagh, Lok Kalyan Marg, Udyog Bhawan, Central Secretariat, Janpath, Mandi House, Supreme Court, Indraprastha, Akshardham, Mayur Vihar Phase-1.