Journey type
Metro connection
Journey summary
Line-by-line directions for this trip
Time
156 min
Fare
₹64.0
Approx. distance
80.7 km
Stations on route
45
Route plan
Start on Green Line towards Inderlok from Kirti Nagar (Green Line Branch). Change 2 times before reaching Sarai.
Towards Inderlok
Kirti Nagar (Green Line Branch) to Punjabi Bagh West
Change to Pink Line at Punjabi Bagh West
Towards Shiv Vihar
Punjabi Bagh West to Lajpat Nagar
Change to Violet Line at Lajpat Nagar
Towards Raja Nahar Singh (Ballabhgarh)
Lajpat Nagar to Sarai
Route at a glance
This summary is calculated for Kirti Nagar (Green Line Branch) to Saraifrom the ordered station and line graph used by the planner.
Journey type
Metro connection
Lines used
Green Line → Pink Line → Violet Line
Network changes
2 interchanges
Interchange sequence: Punjabi Bagh West → Lajpat Nagar.
Line and station naming reference: Delhi Metro Rail Corporation operational network map
Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.
Start journey on Green Line towards Inderlok
Change to Pink Line
Destination station
Parking
Recorded as available
ATM
Recorded as available
Toilet
Recorded as available
Lift
Recorded as available
Escalator
Recorded as available
DMRC published reference; verify current gate and lift status on arrival.
Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.
This calculated journey covers approximately 80.7 km and 44 stops. The planner estimates 156 minutes of travel and a standard estimated fare of ₹64. It uses 3 line sections with 2 interchanges.
These stations are listed in travel order using the same network data as the route calculation.
Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.
Standard estimated fare
₹64.0
Estimated smart card fare
₹57.6
Estimated fare where eligible
₹51.2
The metro route from Kirti Nagar (Green Line Branch) to Sarai has 45 stations, 80.7 km approximate distance and 2 interchanges. Follow the station-by-station timeline for the complete route.
The estimated standard fare for this route is ₹64.0. With a smart card or NCMC, the estimate is ₹57.6. The eligible off-peak/MJQRT estimate is ₹51.2. Operator eligibility rules and the final amount shown before payment take priority.
The estimated travel time is 156 minutes, including interchange time where applicable.
Board the Green Line from Kirti Nagar (Green Line Branch) towards Inderlok.
You need to change metro at Punjabi Bagh West, Lajpat Nagar on this route.
There are 45 stations on the route from Kirti Nagar (Green Line Branch) to Sarai, including the starting and destination stations. This means there are 44 metro stops between the two stations.
This route uses Green Line, Pink Line, Violet Line. Follow the route timeline to see where each line starts and where to change trains.
Stations on this route are Kirti Nagar (Green Line Branch), Satguru Ram Singh Marg, Brigadier Hoshiyar Singh, Bahadurgarh City, Pandit Shree Ram Sharma, Tikri Border, Tikri Kalan, Ghevra, Mundka Industrial Area (MIA), Mundka, Rajdhani Park, Nangloi Railway Station, Nangloi, Maharaja Surajmal Stadium, Udyog Nagar, Peeragarhi, Paschim Vihar West, Paschim Vihar East, Madipur, Shivaji Park, Punjabi Bagh West, ESI - Basaidarapur, Rajouri Garden, Maya Puri, Naraina Vihar, Delhi Cantt., Durgabai Deshmukh South Campus, Sir M. Vishweshwaraiah Moti Bagh, Bhikaji Cama Place, Sarojini Nagar, Dilli Haat - INA, South Extension, Lajpat Nagar, Moolchand, Kailash Colony, Nehru Place, Kalkaji Mandir, Govind Puri, Harkesh Nagar Okhla, Jasola Apollo, Sarita Vihar, Mohan Estate, Tughlakabad Station, Badarpur Border, Sarai.