Journey summary

IP Extension to Azadpur

Line-by-line directions for this trip

Time

84 min

Fare

₹64.0

Approx. distance

35.8 km

Stations on route

13

Route plan

Start on Pink Line towards Shiv Vihar from IP Extension. Change 3 times before reaching Azadpur.

Pink LineBoard for 1 station

Towards Shiv Vihar

IP Extension to Anand Vihar ISBT

Change to Blue Line (Branch) at Anand Vihar ISBT

Blue Line (Branch)Continue for 1 station

Towards Vaishali

Anand Vihar ISBT to Yamuna Bank

Change to Blue Line (Main) at Yamuna Bank

Blue Line (Main)Continue for 4 stations

Towards Noida Electronic City

Yamuna Bank to Rajouri Garden

Change to Pink Line at Rajouri Garden

Pink LineContinue for 6 stations

Towards Majlis Park

Rajouri Garden to Azadpur

Route at a glance

Calculated network summary

This summary is calculated for IP Extension to Azadpurfrom the ordered station and line graph used by the planner.

Journey type

Metro connection

Lines used

Pink Line → Blue Line (Branch) → Blue Line (Main)

Network changes

3 interchanges

Interchange sequence: Anand Vihar ISBT → Yamuna Bank → Rajouri Garden.

Practical planning note: Use the calculated line direction and interchange sequence below, and allow additional time for platform walking at major hubs.

Line and station naming reference: Delhi Metro Rail Corporation operational network map

Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.

Route Timeline

Pink LineBoard for 1 stationTowards Shiv Vihar
IP Extension

Start journey on Pink Line towards Shiv Vihar

Anand Vihar ISBT

Change to Blue Line (Branch)

Blue Line (Branch)Continue for 1 stationTowards Vaishali
Yamuna Bank

Change to Blue Line (Main)

Blue Line (Main)Continue for 4 stationsTowards Noida Electronic City
Pink LineContinue for 6 stationsTowards Majlis Park

Destination station

Azadpur

Yellow LinePink Line
View station details

Parking

Recorded as available

ATM

Recorded as available

Toilet

Recorded as available

Lift

Recorded as available

Escalator

Recorded as available

Accessibility information

  • Gate No.3: Towards Lal Bagh, Azadpur Railway Stadium
  • Gate No.4: Towards Chatralshal Stadium, Model Town-3

DMRC published reference; verify current gate and lift status on arrival.

Facilities reported along this route

Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.

Journey overview

This calculated journey covers approximately 35.8 km and 12 stops. The planner estimates 84 minutes of travel and a standard estimated fare of 64. It uses 4 line sections with 3 interchanges.

Interchange guidance

  • Change lines inside Anand Vihar ISBT. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Yamuna Bank. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Rajouri Garden. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.

Stations on this route

These stations are listed in travel order using the same network data as the route calculation.

  1. IP Extension
  2. Anand Vihar ISBT
  3. Yamuna Bank
  4. Tilak Nagar
  5. Subhash Nagar
  6. Tagore Garden
  7. Rajouri Garden
  8. ESI - Basaidarapur
  9. Punjabi Bagh West
  10. Shakurpur
  11. Netaji Subhash Place
  12. Shalimar Bagh
  13. Azadpur
Fare and journey time are planning estimates. Platform numbers, live disruptions and gate availability can change, so confirm the line name and terminal direction on station displays before boarding.

Fare Options

Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.

Standard fare (QR ticket)

Standard estimated fare

Base

64.0

Smart card / NCMC fare

Estimated smart card fare

57.6

Discounted fare (off-peak / MJQRT)

Estimated fare where eligible

20% off

51.2

Frequently Asked Questions

What is the metro route from IP Extension to Azadpur?

The metro route from IP Extension to Azadpur has 13 stations, 35.8 km approximate distance and 3 interchanges. Follow the station-by-station timeline for the complete route.

How much is the fare from IP Extension to Azadpur?

The estimated standard fare for this route is ₹64.0. With a smart card or NCMC, the estimate is ₹57.6. The eligible off-peak/MJQRT estimate is ₹51.2. Operator eligibility rules and the final amount shown before payment take priority.

How long does it take from IP Extension to Azadpur?

The estimated travel time is 84 minutes, including interchange time where applicable.

Which metro line should I board from IP Extension?

Board the Pink Line from IP Extension towards Shiv Vihar.

Where do I change metro between IP Extension and Azadpur?

You need to change metro at Anand Vihar ISBT, Yamuna Bank, Rajouri Garden on this route.

How many stations are there from IP Extension to Azadpur?

There are 13 stations on the route from IP Extension to Azadpur, including the starting and destination stations. This means there are 12 metro stops between the two stations.

Which metro lines are used from IP Extension to Azadpur?

This route uses Pink Line, Blue Line (Branch), Blue Line (Main). Follow the route timeline to see where each line starts and where to change trains.

What are the stations between IP Extension and Azadpur?

Stations on this route are IP Extension, Anand Vihar ISBT, Yamuna Bank, Tilak Nagar, Subhash Nagar, Tagore Garden, Rajouri Garden, ESI - Basaidarapur, Punjabi Bagh West, Shakurpur, Netaji Subhash Place, Shalimar Bagh, Azadpur.