Journey type
Interchange route
Journey summary
Line-by-line directions for this trip
Travelling from Haiderpur Badli Mor to Mayur Vihar Phase-1 on the Delhi Metro takes approximately 54 minutes covering 20 stations and 2 interchanges. The standard token fare is ₹54 (or ₹49 with a Smart Card).
Travel Time
54 min
Standard Fare
₹54
Smart Card
₹49
Interchanges
2
Total Stations
20
Distance
24.9 km
First and last train times use reported Haiderpur Badli Mor timing data. Direction-wise timing can vary by line and destination.
Route plan
Start on Yellow Line towards Millennium City Centre Gurugram from Haiderpur Badli Mor. Change 2 times before reaching Mayur Vihar Phase-1.
Useful for comparing a full metro journey across multiple connected lines in the Delhi NCR network.
This route connects the area around DDA Orchard Park with the area around Anand Lok DDA Park.
Towards Millennium City Centre Gurugram
Haiderpur Badli Mor to Kashmere Gate
Change to Violet Line at Kashmere Gate
Towards Raja Nahar Singh (Ballabhgarh)
Kashmere Gate to Mandi House
Change to Blue Line (Main) at Mandi House
Towards Noida Electronic City
Mandi House to Mayur Vihar Phase-1
Route at a glance
This summary is calculated for Haiderpur Badli Mor to Mayur Vihar Phase-1from the ordered station and line graph used by the planner.
Journey type
Interchange route
Lines used
Yellow Line → Violet Line → Blue Line (Main)
Network changes
2 interchanges
Interchange sequence: Kashmere Gate → Mandi House.
Line and station naming reference: Delhi Metro Rail Corporation operational network map
Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.
Start journey on Yellow Line towards Millennium City Centre Gurugram
Change to Violet Line
Destination station
Parking
Recorded as available
ATM
Recorded as available
Toilet
Recorded as available
Lift
Recorded as available
Escalator
Recorded as available
Anand Lok DDA Park, Hindustan Times Apartments, ESIC Dispensary-cum-Diagnostic Center
DMRC published reference; verify current gate and lift status on arrival.
Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.
This calculated journey covers approximately 24.9 km and 19 stops. The planner estimates 54 minutes of travel and a standard estimated fare of ₹54. It uses 3 line sections with 2 interchanges.
This route from Haiderpur Badli Mor to Mayur Vihar Phase-1 crosses 3 line sections. It is most useful when you follow the interchange order below and check the terminal direction shown for each onward train before boarding.
Multi-line journey: Useful for comparing a full metro journey across multiple connected lines in the Delhi NCR network.
This route connects the area around DDA Orchard Park with the area around Anand Lok DDA Park.
This route's line signature is Yellow Line (Haiderpur Badli Mor to Kashmere Gate), Violet Line (Kashmere Gate to Mandi House), Blue Line (Main) (Mandi House to Mayur Vihar Phase-1). The first stations in travel order are Haiderpur Badli Mor, Jahangirpuri, Adarsh Nagar, Azadpur, Model Town, GTB Nagar, and more, which helps make this station pair distinct from other journeys using some of the same interchange hubs.
Origin station
Haiderpur Badli Mor is metro station on the yellow line.
Nearby: DDA Orchard Park, ESI TB Hospital, Vivekananda Institute of Professional Studies - Technical Campus, Max Healthcare.
Destination station
Mayur Vihar Phase-1 is interchange station serving blue line (main) and pink line.
Nearby: Anand Lok DDA Park, Hindustan Times Apartments, ESIC Dispensary-cum-Diagnostic Center.
Haiderpur Badli Mor gates
Lift No.3: Near Gate No.2 of the Station; towards DDA Flats & Parking Side
Mayur Vihar Phase-1 gates
Lift No.2: Near Gate No.2 of the Station; towards Mayur Vihar Extn. | Lift No.4A: Near Gate No.4 of the Station; towards Rishabh Public School
These stations are listed in travel order using the same network data as the route calculation.
Open related route pages from the same origin, destination and interchange network to compare alternate Delhi Metro journeys.
Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.
Calculate another Delhi Metro fareStandard estimated fare
₹54
Estimated smart card fare
₹49
Estimated fare where eligible
₹43.2
The metro route from Haiderpur Badli Mor to Mayur Vihar Phase-1 has 20 stations, 24.9 km approximate distance and 2 interchanges. Follow the station-by-station timeline for the complete route.
The estimated standard fare for this route is ₹54.0. With a smart card or NCMC, the estimate is ₹49.0. The eligible off-peak/MJQRT estimate is ₹43.2. Operator eligibility rules and the final amount shown before payment take priority.
The estimated travel time is 54 minutes, including interchange time where applicable.
Board the Yellow Line from Haiderpur Badli Mor towards Millennium City Centre Gurugram.
You need to change metro at Kashmere Gate, Mandi House on this route.
There are 20 stations on the route from Haiderpur Badli Mor to Mayur Vihar Phase-1, including the starting and destination stations. This means there are 19 metro stops between the two stations.
This route uses Yellow Line, Violet Line, Blue Line (Main). Follow the route timeline to see where each line starts and where to change trains.
Stations on this route are Haiderpur Badli Mor, Jahangirpuri, Adarsh Nagar, Azadpur, Model Town, GTB Nagar, Vishwavidyalaya, Vidhan Sabha, Civil Lines, Kashmere Gate, Lal Quila, Jama Masjid, Delhi Gate, ITO, Mandi House, Supreme Court, Indraprastha, Yamuna Bank, Akshardham, Mayur Vihar Phase-1.
Haiderpur Badli Mor to Mayur Vihar Phase-1 is best described here as a multi-line journey. Useful for comparing a full metro journey across multiple connected lines in the Delhi NCR network.
Haiderpur Badli Mor currently has reported gate references such as Lift No.3 for Near Gate No.2 of the Station; towards DDA Flats & Parking Side. Station signboards and live gate operations should be treated as the final reference on the day of travel.
Reported nearby places around Mayur Vihar Phase-1 include Anand Lok DDA Park, Hindustan Times Apartments, ESIC Dispensary-cum-Diagnostic Center. Use the station exit and gate boards to match your final destination after arriving.