Journey summary

Dhansa Bus Stand to Phase 3

Line-by-line directions for this trip

Time

125 min

Fare

₹64.0

Approx. distance

54.7 km

Stations on route

34

Route plan

Start on Grey Line towards Dwarka from Dhansa Bus Stand. Change 4 times before reaching Phase 3.

Grey LineBoard for 3 stations

Towards Dwarka

Dhansa Bus Stand to Dwarka

Change to Blue Line (Main) at Dwarka

Blue Line (Main)Continue for 5 stations

Towards Noida Electronic City

Dwarka to Janakpuri West

Change to Magenta Line at Janakpuri West

Magenta LineContinue for 11 stations

Towards Botanical Garden

Janakpuri West to Hauz Khas

Change to Yellow Line at Hauz Khas

Yellow LineContinue for 9 stations

Towards Millennium City Centre Gurugram

Hauz Khas to Sikanderpur

Change to Rapid Metro Gurugram at Sikanderpur

Rapid Metro GurugramContinue for 5 stations

Towards Phase 3

Sikanderpur to Phase 3

Route at a glance

Calculated network summary

This summary is calculated for Dhansa Bus Stand to Phase 3from the ordered station and line graph used by the planner.

Journey type

Metro connection

Lines used

Grey Line → Blue Line (Main) → Magenta Line → Yellow Line → Rapid Metro Gurugram

Network changes

4 interchanges

Interchange sequence: Dwarka → Janakpuri West → Hauz Khas → Sikanderpur.

Practical planning note: Use the calculated line direction and interchange sequence below, and allow additional time for platform walking at major hubs.

Line and station naming reference: Delhi Metro Rail Corporation operational network map

Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.

Route Timeline

Grey LineBoard for 3 stationsTowards Dwarka
Dhansa Bus Stand

Start journey on Grey Line towards Dwarka

Dwarka

Change to Blue Line (Main)

Blue Line (Main)Continue for 5 stationsTowards Noida Electronic City
Yellow LineContinue for 9 stationsTowards Millennium City Centre Gurugram
Rapid Metro GurugramContinue for 5 stationsTowards Phase 3

Destination station

Phase 3

Rapid Metro Gurugram
View station details

Parking

Not confirmed in our data

ATM

Not confirmed in our data

Toilet

Recorded as available

Lift

Recorded as available

Escalator

Recorded as available

Facilities reported along this route

Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.

Journey overview

This calculated journey covers approximately 54.7 km and 33 stops. The planner estimates 125 minutes of travel and a standard estimated fare of 64. It uses 5 line sections with 4 interchanges.

Interchange guidance

  • Change lines inside Dwarka. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Janakpuri West. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Hauz Khas. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Sikanderpur. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
Fare and journey time are planning estimates. Platform numbers, live disruptions and gate availability can change, so confirm the line name and terminal direction on station displays before boarding.

Fare Options

Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.

Standard fare (QR ticket)

Standard estimated fare

Base

64.0

Smart card / NCMC fare

Estimated smart card fare

57.6

Discounted fare (off-peak / MJQRT)

Estimated fare where eligible

20% off

51.2

Frequently Asked Questions

What is the metro route from Dhansa Bus Stand to Phase 3?

The metro route from Dhansa Bus Stand to Phase 3 has 34 stations, 54.7 km approximate distance and 4 interchanges. Follow the station-by-station timeline for the complete route.

How much is the fare from Dhansa Bus Stand to Phase 3?

The estimated standard fare for this route is ₹64.0. With a smart card or NCMC, the estimate is ₹57.6. The eligible off-peak/MJQRT estimate is ₹51.2. Operator eligibility rules and the final amount shown before payment take priority.

How long does it take from Dhansa Bus Stand to Phase 3?

The estimated travel time is 125 minutes, including interchange time where applicable.

Which metro line should I board from Dhansa Bus Stand?

Board the Grey Line from Dhansa Bus Stand towards Dwarka.

Where do I change metro between Dhansa Bus Stand and Phase 3?

You need to change metro at Dwarka, Janakpuri West, Hauz Khas, Sikanderpur on this route.

How many stations are there from Dhansa Bus Stand to Phase 3?

There are 34 stations on the route from Dhansa Bus Stand to Phase 3, including the starting and destination stations. This means there are 33 metro stops between the two stations.

Which metro lines are used from Dhansa Bus Stand to Phase 3?

This route uses Grey Line, Blue Line (Main), Magenta Line, Yellow Line, Rapid Metro Gurugram. Follow the route timeline to see where each line starts and where to change trains.

What are the stations between Dhansa Bus Stand and Phase 3?

Stations on this route are Dhansa Bus Stand, Najafgarh, Nangli, Dwarka, Dwarka Mor, Nawada, Uttam Nagar West, Uttam Nagar East, Janakpuri West, Dabri Mor - Janakpuri South, Dashrath Puri, Palam, Sadar Bazar Cantonment, Terminal 1-IGI Airport, Shankar Vihar, Vasant Vihar, Kishan Garh, Munirka, IIT, Hauz Khas, Malviya Nagar, Saket, Qutab Minar, Chhatarpur, Sultanpur, Ghitorni, Arjan Garh, Guru Dronacharya, Sikanderpur, Phase 2, Belvedere Towers, Cyber City, Moulsari Avenue, Phase 3.