Journey summary

Depot to Jangpura

Line-by-line directions for this trip

Time

112 min

Fare

₹64.0

Approx. distance

49.6 km

Stations on route

37

Route plan

Start on Aqua Line towards Noida Sector 51 from Depot. Change 3 times before reaching Jangpura.

Aqua LineBoard for 20 stations

Towards Noida Sector 51

Depot to Noida Sector 51

Walk 300 m to Noida Sector 52 (10 min), then board Blue Line (Main)

Blue Line (Main)Board for 10 stations

Towards Dwarka Sector 21

Noida Sector 52 to Mayur Vihar Phase-1

Change to Pink Line at Mayur Vihar Phase-1

Pink LineContinue for 4 stations

Towards Majlis Park

Mayur Vihar Phase-1 to Lajpat Nagar

Change to Violet Line at Lajpat Nagar

Violet LineContinue for 1 station

Towards Kashmere Gate

Lajpat Nagar to Jangpura

Route at a glance

Calculated network summary

This summary is calculated for Depot to Jangpurafrom the ordered station and line graph used by the planner.

Journey type

Metro connection

Lines used

Aqua Line → Blue Line (Main) → Pink Line → Violet Line

Network changes

3 interchanges

Interchange sequence: Noida Sector 51 → Mayur Vihar Phase-1 → Lajpat Nagar.

Practical planning note: Use the calculated line direction and interchange sequence below, and allow additional time for platform walking at major hubs.

Line and station naming reference: Delhi Metro Rail Corporation operational network map

Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.

Route Timeline

Pink LineContinue for 4 stationsTowards Majlis Park
Violet LineContinue for 1 stationTowards Kashmere Gate
Jangpura

Destination

Destination station

Jangpura

Violet Line
View station details

Parking

Recorded as available

ATM

Recorded as available

Toilet

Recorded as available

Lift

Recorded as available

Escalator

Recorded as available

Accessibility information

  • Lift No.3: Near Gate No.1 of Station; towards MTNL Building, Soochna Bhawan
  • Lift No.4: Near Gate No.2 of the Station; towards Nizamuddin Dargah

DMRC published reference; verify current gate and lift status on arrival.

Facilities reported along this route

Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.

Journey overview

This calculated journey covers approximately 49.6 km and 35 stops. The planner estimates 112 minutes of travel and a standard estimated fare of 64. It uses 4 line sections with 3 interchanges.

Interchange guidance

  • Walk 300 m from Noida Sector 51 to Noida Sector 52; allow approximately 10 minutes for this out-of-station connection.
  • Change lines inside Mayur Vihar Phase-1. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
  • Change lines inside Lajpat Nagar. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
Fare and journey time are planning estimates. Platform numbers, live disruptions and gate availability can change, so confirm the line name and terminal direction on station displays before boarding.

Fare Options

Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.

Standard fare (QR ticket)

Standard estimated fare

Base

64.0

Smart card / NCMC fare

Estimated smart card fare

57.6

Discounted fare (off-peak / MJQRT)

Estimated fare where eligible

20% off

51.2

Frequently Asked Questions

What is the metro route from Depot to Jangpura?

The metro route from Depot to Jangpura has 37 stations, 49.6 km approximate distance and 3 interchanges. Follow the station-by-station timeline for the complete route.

How much is the fare from Depot to Jangpura?

The estimated standard fare for this route is ₹64.0. With a smart card or NCMC, the estimate is ₹57.6. The eligible off-peak/MJQRT estimate is ₹51.2. Operator eligibility rules and the final amount shown before payment take priority.

How long does it take from Depot to Jangpura?

The estimated travel time is 112 minutes, including interchange time where applicable.

Which metro line should I board from Depot?

Board the Aqua Line from Depot towards Noida Sector 51.

Where do I change metro between Depot and Jangpura?

You need to change metro at Noida Sector 51 to Noida Sector 52 by walking, Mayur Vihar Phase-1, Lajpat Nagar on this route.

How many stations are there from Depot to Jangpura?

There are 37 stations on the route from Depot to Jangpura, including the starting and destination stations. This means there are 35 metro stops between the two stations.

Which metro lines are used from Depot to Jangpura?

This route uses Aqua Line, Blue Line (Main), Pink Line, Violet Line. Follow the route timeline to see where each line starts and where to change trains.

What are the stations between Depot and Jangpura?

Stations on this route are Depot, GNIDA Office, Delta 1, Alpha 1, Pari Chowk, Knowledge Park II, Noida Sector 148, Noida Sector 147, Noida Sector 146, Noida Sector 145, Noida Sector 144, Noida Sector 143, Noida Sector 142, Noida Sector 137, Noida Sector 83, NSEZ, Noida Sector 81, Noida Sector 101, Noida Sector 76, Noida Sector 50, Noida Sector 51, Noida Sector 52, Noida Sector 34, Noida City Centre, Golf Course, Botanical Garden, Noida Sector 18, Noida Sector 16, Noida Sector 15, New Ashok Nagar, Mayur Vihar Extension, Mayur Vihar Phase-1, Sarai Kale Khan - Nizamuddin, Ashram, Vinobapuri, Lajpat Nagar, Jangpura.