Journey summary

Ashok Park Main to South Extension

Line-by-line directions for this trip

Time

42 min

Fare

₹43.0

Approx. distance

19.8 km

Stations on route

14

Route plan

Start on Green Line towards Kirti Nagar (Green Line Branch) from Ashok Park Main. Change 1 time before reaching South Extension.

Green LineBoard for 2 stations

Towards Kirti Nagar (Green Line Branch)

Ashok Park Main to Punjabi Bagh West

Change to Pink Line at Punjabi Bagh West

Pink LineContinue for 11 stations

Towards Shiv Vihar

Punjabi Bagh West to South Extension

Route at a glance

Calculated network summary

This summary is calculated for Ashok Park Main to South Extensionfrom the ordered station and line graph used by the planner.

Journey type

Metro connection

Lines used

Green Line → Pink Line

Network changes

1 interchange

Interchange sequence: Punjabi Bagh West.

Practical planning note: Use the calculated line direction and interchange sequence below, and allow additional time for platform walking at major hubs.

Line and station naming reference: Delhi Metro Rail Corporation operational network map

Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.

Route Timeline

Green LineBoard for 2 stationsTowards Kirti Nagar (Green Line Branch)
Ashok Park Main

Start journey on Green Line towards Kirti Nagar (Green Line Branch)

Punjabi Bagh West

Change to Pink Line

Destination station

South Extension

Pink Line
View station details

Parking

Not confirmed in our data

ATM

Not confirmed in our data

Toilet

Recorded as available

Lift

Recorded as available

Escalator

Recorded as available

Accessibility information

  • Lift No.2: Near Gate No.4 of the Station; towards South Ext. Part-II
  • Lift No.3: Near Gate No.2 of the Station; towards South Ext. Part-I

DMRC published reference; verify current gate and lift status on arrival.

Facilities reported along this route

Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.

Journey overview

This calculated journey covers approximately 19.8 km and 13 stops. The planner estimates 42 minutes of travel and a standard estimated fare of 43. It uses 2 line sections with 1 interchange.

Interchange guidance

  • Change lines inside Punjabi Bagh West. Follow signs for the next line and its displayed terminal direction; interchange walking time varies by platform.
Fare and journey time are planning estimates. Platform numbers, live disruptions and gate availability can change, so confirm the line name and terminal direction on station displays before boarding.

Fare Options

Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.

Standard fare (QR ticket)

Standard estimated fare

Base

43.0

Smart card / NCMC fare

Estimated smart card fare

38.7

Discounted fare (off-peak / MJQRT)

Estimated fare where eligible

20% off

34.4

Frequently Asked Questions

What is the metro route from Ashok Park Main to South Extension?

The metro route from Ashok Park Main to South Extension has 14 stations, 19.8 km approximate distance and 1 interchange. Follow the station-by-station timeline for the complete route.

How much is the fare from Ashok Park Main to South Extension?

The estimated standard fare for this route is ₹43.0. With a smart card or NCMC, the estimate is ₹38.7. The eligible off-peak/MJQRT estimate is ₹34.4. Operator eligibility rules and the final amount shown before payment take priority.

How long does it take from Ashok Park Main to South Extension?

The estimated travel time is 42 minutes, including interchange time where applicable.

Which metro line should I board from Ashok Park Main?

Board the Green Line from Ashok Park Main towards Kirti Nagar (Green Line Branch).

Where do I change metro between Ashok Park Main and South Extension?

You need to change metro at Punjabi Bagh West on this route.

How many stations are there from Ashok Park Main to South Extension?

There are 14 stations on the route from Ashok Park Main to South Extension, including the starting and destination stations. This means there are 13 metro stops between the two stations.

Which metro lines are used from Ashok Park Main to South Extension?

This route uses Green Line, Pink Line. Follow the route timeline to see where each line starts and where to change trains.

What are the stations between Ashok Park Main and South Extension?

Stations on this route are Ashok Park Main, Punjabi Bagh, Punjabi Bagh West, ESI - Basaidarapur, Rajouri Garden, Maya Puri, Naraina Vihar, Delhi Cantt., Durgabai Deshmukh South Campus, Sir M. Vishweshwaraiah Moti Bagh, Bhikaji Cama Place, Sarojini Nagar, Dilli Haat - INA, South Extension.