Journey type
Metro connection
Journey summary
Line-by-line directions for this trip
Time
40 min
Fare
₹43.0
Approx. distance
15.0 km
Stations on route
13
Route plan
Start on Pink Line towards Majlis Park from Anand Vihar ISBT. Change 2 times before reaching Central Secretariat.
Towards Majlis Park
Anand Vihar ISBT to Mayur Vihar Phase-1
Change to Blue Line (Main) at Mayur Vihar Phase-1
Towards Dwarka Sector 21
Mayur Vihar Phase-1 to Mandi House
Change to Violet Line at Mandi House
Towards Raja Nahar Singh (Ballabhgarh)
Mandi House to Central Secretariat
Route at a glance
This summary is calculated for Anand Vihar ISBT to Central Secretariatfrom the ordered station and line graph used by the planner.
Journey type
Metro connection
Lines used
Pink Line → Blue Line (Main) → Violet Line
Network changes
2 interchanges
Interchange sequence: Mayur Vihar Phase-1 → Mandi House.
Line and station naming reference: Delhi Metro Rail Corporation operational network map
Reference reviewed 9 August 2026. Fare and travel time remain planner estimates; check official live notices before travelling.
Start journey on Pink Line towards Majlis Park
Change to Blue Line (Main)
Destination
Destination station
Parking
Not confirmed in our data
ATM
Recorded as available
Toilet
Recorded as available
Lift
Recorded as available
Escalator
Recorded as available
DMRC published reference; verify current gate and lift status on arrival.
Stations where our current data records selected passenger facilities. Confirm essential facilities before travel.
This calculated journey covers approximately 15.0 km and 12 stops. The planner estimates 40 minutes of travel and a standard estimated fare of ₹43. It uses 3 line sections with 2 interchanges.
These stations are listed in travel order using the same network data as the route calculation.
Estimated fare by payment type. Eligibility, operator rules and the final amount shown before payment take priority.
Standard estimated fare
₹43.0
Estimated smart card fare
₹38.7
Estimated fare where eligible
₹34.4
The metro route from Anand Vihar ISBT to Central Secretariat has 13 stations, 15.0 km approximate distance and 2 interchanges. Follow the station-by-station timeline for the complete route.
The estimated standard fare for this route is ₹43.0. With a smart card or NCMC, the estimate is ₹38.7. The eligible off-peak/MJQRT estimate is ₹34.4. Operator eligibility rules and the final amount shown before payment take priority.
The estimated travel time is 40 minutes, including interchange time where applicable.
Board the Pink Line from Anand Vihar ISBT towards Majlis Park.
You need to change metro at Mayur Vihar Phase-1, Mandi House on this route.
There are 13 stations on the route from Anand Vihar ISBT to Central Secretariat, including the starting and destination stations. This means there are 12 metro stops between the two stations.
This route uses Pink Line, Blue Line (Main), Violet Line. Follow the route timeline to see where each line starts and where to change trains.
Stations on this route are Anand Vihar ISBT, IP Extension, Mandawali - West Vinod Nagar, East Vinod Nagar - Mayur Vihar-II, Trilokpuri Sanjay Lake, Mayur Vihar Pocket 1, Mayur Vihar Phase-1, Akshardham, Indraprastha, Supreme Court, Mandi House, Janpath, Central Secretariat.